论述了当前工程量清单招标的现状及建立企业定额的必要性。
This paper dwells on the present situation of inviting bids by construction volume list and the necessity of establishing enterprise quota.
通过对目前招标投标方式存在问题的分析,提出实行工程量清单招标的必要性。
Through the analysis of the problems in the current practice of inviting and submitting tenders, the author points out the necessity of providing the engineering detailed list.
简要介绍了传统计价模式招标和工程量清单招标的缺点以及采用工程量清单招标的基本要求。
In this paper the disadvantages of the bidding of traditional valuation mode and the disadvantages of the bill of...
简要介绍了传统计价模式招标和工程量清单招标的缺点以及采用工程量清单招标的基本要求。
In this paper the disadvantages of the bidding of traditional valuation mode and the disadvantages of the b...
本文论述了工程量清单招标特点及其工作准备和工作程序,对指导实施工程量清单招标具有指导作用。
This paper states the characteristic of engineering bill bidding and its working program to provide direction function for implementing engineering bill bidding.
在工程量清单规范实行的背景下,如何把招标文件编制好,减少经济索赔,以利于维护业主的经济利益。
Under the background of the bill of quantities standard implements, how to completes tender document, reduced economy claim, favors maintains owner's economic interest.
阐述了工程量清单计价与招标投标的关系以及应用时就注意的问题。
The relation between the quantities calculation and bidding, and some problems in application are discussed in this paper.
随着《建设工程工程量清单计价规范》的颁布实施,采用工程量清单计价更加能满足招标投标竞争定价和经评审合理低价中标的要求。
With the implement of the Specification of Quantity Billing in Construction Projects, pricing based on bill of quantities can meet the need of competitive pricing and judged reasonable low price.
合理确定招标工程量清单是有效实施工程造价事前控制的重要环节。
To make BOQ (Bill of Quantity) reasonable is a key measure to approach the goal of preceding cost control effectively.
从实践的角度就提高招标控制价和工程量清单编制质量的方法作简要分析,借此总结经验,供同业参考。 。
The paper briefly analyses how to improve the quality of tender control price and bill of quantities based on practice, to provide reference for fraternity.
工程量清单模式下招标,在工程建筑领域来说,国内现行的招投标方法、工程计价方式、施工技术都有很大的冲击。
To the construction project, our country present move of bid method, the project valuation way, the traditional construction technique has been under the very big impact.
随着工程量清单计价模式的推广,按国际惯例招标投标势在必行。
With the bill pricing model projects to promote, in accordance with international bidding practices is imperative.
【摘要】工程量清单计价模式下在工程招标、施工阶段和竣工结算中成本控制重点和方法。
The project, under BOQ tenders for the construction phase and completion of settlement in focus and methods of cost control.
【摘要】工程量清单计价模式下在工程招标、施工阶段和竣工结算中成本控制重点和方法。
The project, under BOQ tenders for the construction phase and completion of settlement in focus and methods of cost control.
应用推荐