• 发展长江经济带一项系统工程需要明确路线图时间表

    Developing the Yangtze River Economic Belt is a systematic project which calls for a clear road map and timetable.

    youdao

  • 工程工程沟通协助准备工作时间表协调工作量的分配。

    Assists in preparing weekly work schedules in accordance with workload and priorities in coordination with Engineer.

    youdao

  • 计划时间表提供培训WPG,地点可能会要求规定他们成绩,并工程上的努力

    Plans, schedules and provides training for WPG sites as may be requested or required for their success in their engineering efforts.

    youdao

  • 时间表问题运筹学领域系统工程领域中的典型组合优化问题,是由于事件对时间和空间的资源争夺产生的,属于NP完全类问题。

    Timetable problem is a typical problem of combined optimization in the fields of operational research and systems engineering, which belongs to NP problem.

    youdao

  • 负责投产系统时间表安排先期制造工程任务质量执行

    Be in charge of the quality execution of Advanced Manufacturing Engineering tasks as defined on PLUS timeline.

    youdao

  • 负责投产系统时间表安排先期制造工程任务质量执行

    Be in charge of the quality execution of Advanced Manufacturing Engineering tasks as defined on PLUS timeline.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定