• 这样工程批准程序一定会加快

    That licensing procedures for projects would move faster.

    youdao

  • 使用任何这些方法最关键得到经理(比如工程总监或是部门主管)对新的工作描述正式批准

    With either of these approaches, it is critical to get formal approval of the manager's new job description from his or her manager (for example, the Engineering Director, or department head).

    youdao

  • 得到经理(比如工程总监或是部门主管)对新的工作描述正式批准

    Get formal approval of the manager's new job description from his or her manager (for example, the Engineering Director, or department head).

    youdao

  • 法国工程企业Areva也同样维护EPR设计NRC批准悬而未决

    The French nuclear engineering firm Areva also defended its EPR design, which is also pending NRC approval.

    youdao

  • 按照批准工程进度计划,协调专业进度计划实际运转督促进度计划实施

    According to approval project general schedule, coordinating the practical operating of every specialty plan, and supervising the carrying out of process plan.

    youdao

  • 这项耗资达300亿美元工程计划获得沙特王室批准

    Plans to start construction of this USD 30 billion structure was already made known by the Saudi Royal Family.

    youdao

  • 工程项目通过批准可行性研究进入费用控制实施阶段

    Upon passing the study of approved feasibility, the project will enter the expenses control implementation phase.

    youdao

  • 雇主收到批准履约保证之后,工程师才能为任何付款开具支付证书。

    No amount will be certified or paid until the Employer has received and approved the Performance Security.

    youdao

  • 批准所有技术变更(BCP内部),跟踪有时批准工程变更

    Approve all technical changes (BCP internal), Follow up and sometimes approve Engineering change.

    youdao

  • 如果工程批准建议包括一项部分永久工程设计改变,除非双方另有协议,否则

    If a proposal, which is approved by the Engineer, includes a change in the design of part of the Permanent Works, then unless otherwise agreed by both Parties.

    youdao

  • 对于所有要求工程施工移交必须得到业主工程批准

    The engineer's approval is necessary to be taken on all the required works and submissions.

    youdao

  • 护滩、岸、工程的范围按照批准设计文件确定

    The area of riprap protection, protective revetments and silt arrester projects shall be defined in accordance with the approved design documents.

    youdao

  • 部品工程师一起审核/批准潜在或者已存在供应商确保他们好的质量保证体系

    Work with Qualification Engineer to audit/ approve potential or existing supplier, make sure they have good quality management system.

    youdao

  • 地震工程中的学术背景不足候选人可能会要求参加桥梁课程批准加入科目之前课程

    Note: Candidates with an insufficient academic background in Earthquake Engineering may be required to take a bridging course or courses prior to being approved into the programme.

    youdao

  • 如果要求工程行使规定权力之前获得雇主批准,则此类要求合同专用条件注明

    If the Engineer is required to obtain the approval of the Employer before exercising a specified authority, the requirements shall be as stated in the Particular Conditions.

    youdao

  • 这些成本估价工程开工之前必须先得到运营商工程主管或者运营商执行主管书面批准

    These cost estimates must be approved by the OPERATOR Construction Supervisor or the OPERATOR Implementation Supervisor in writing prior to the start of any WORK.

    youdao

  • 产品导入工程生产部制造工程师一起审核已经递交审核的ECO然后递交批准

    Review ECO which is submitted for review, with NPI Engineer or MOM Manufacturing Engineer, and then submit it for approval.

    youdao

  • 需要取得省级区域专业工程协会许可,才可以批准工程图纸报告作为专业工程(专业工程)进行实践

    Licensing by a provincial or territorial association of professional engineers is required to approve engineering drawings and reports and to practise as a professional engineer (P. eng.).

    youdao

  • 制造工程制作部经理则分别在<订购清单>和<大肉钢材订购单>审核批准

    Manufacturing engineer and manager review and approve Mould Block Purchasing Order and Big Tessera Steel Purchasing Order.

    youdao

  • 但是工程更改必须经过设计人员批准以保证不会损伤产品功能

    But, in the project change must have to pass through designs the personnel to authorize, guaranteed cannot damage the product the function.

    youdao

  • 可行时,经aa批准开垦土地土方工程使用干净挖掘

    Clean excavated material shall be used for land reclamation or earthwork where practicable and subject to approval by AA.

    youdao

  • 批准变更必须能够有权代表业主行动业主造成额外工程

    The person approving the change must also have the authority to act for the owner and incur the liability for the owner on the extra work.

    youdao

  • 批准变更必须能够有权代表业主行动业主造成额外工程

    The person approving the change must also have the authority to act for the owner and incur the liability for the owner on the extra work.