• 接收工程工程发布系统中的指令,在物料系统中进行操作如实反映变更信息零件级别用量结构)。

    Receiving engineering change information and operating accordingly in material management system to reflect the change information (part level/usage/structure, etc).

    youdao

  • 监理工程发出变更指令承包人就监理工程师的变更指令执行

    If supervision engineer issued a directive, contractor should change by supervision engineer change instruction execution.

    youdao

  • 监理工程发出变更指令承包人就监理工程师的变更指令执行

    If supervision engineer issued a directive, contractor should change by supervision engineer change instruction execution.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定