视频展示了在工程变更单情景下的协作。
The presented scenario shows collaboration in the context of engineering change order.
管理监督工程变更的执行。
工程变更的执行日期是否在相关的报告记录?
根据工程变更申请定义和发布零件及零件清单。
Defines and issues alterations of parts and part lists according to Engineering Change Requests.
一般由工程部决定ecn,没有工程变更要求管理系统。
It is up to only Engineering to decide for ECN. No systematic ECR feedback.
批准所有技术变更(BCP内部),跟踪和有时批准工程变更。
Approve all technical changes (BCP internal), Follow up and sometimes approve Engineering change.
介绍了钻孔桩地质变化引起的工程变更的估价原则和估价方法。
This paper introduces the appraisal principles and methods of engineering changes are caused by geologic changes in drilling hole pour pile.
低成本地增强制造过程、不合格品和工程变更管理的无纸化报告;\ n ?
Cost effectively enhance paperless reporting for manufacturing, nonconformances and Engineering Change management.
工程变更与索赔,是在工程实施阶段的风险管理工作中的重要内容。
Project alteration and the claim for compensation are major questions in the risk management in project construction.
摘要:在工程建设过程中,由于各种原因,工程变更的情况时有发生。
Abstract: in the process of project construction, because all sorts of reasons, engineering change situation happen from time to tome.
工程变更与索赔,是在工程实施阶段的风险管理工作中的重要内容。
The main points of claim indemnity consciousness and management in engineering construction are explained.
在工厂变更管理系统中接收工程变更,确认无误后启动相应的变更流程。
Receiving change information in plant change management system, initiate running change implementation process when all query identified.
因此,需要承包商从风险管理的角度出发,重视工程变更中的风险管理。
Therefore, from the perspective of risk management, contractor should pay attention to risk management in the engineering change.
工程变更管理是一个动态管理过程,这一过程控制的关键在于建设单位。
Changing construction is a dynamic management process and the key point for project control is the constructor.
建立合理的工程变更方案评价指标体系是开展工程变更方案评价的基础。
The project to establish a rational evaluation system of the construction change is the basis of the program evaluation of the construction change.
全权负责在改进产品成本、交付以及质量而进行的工程变更时的建议和实施。
Overall responsible for recommends and implements changes to product or process which would improve cost, delivery and quality to the customer.
本文对如何应用FIDIC施工合同条件的条款处理工程变更进行了简要介绍。
The construction contract FIDIC conditions of the application of the provisions dealing with changes in the project briefing.
Fabric提供一个业务流程以在工程变更阶段指定和选定工程变更请求(ECRs)。
Fabric provides a business process for specifying and deciding on engineering change requests (ECRs) at the engineering change phase.
确保成本数据的更新要包含最新的工程变更,制造过程定义或经济个体假设变化。
Ensure cost data up to date with most recent engineering changes, manufacturing process definition, or economics assumption changes.
编制评估承包商投标书的文件,并提供其它与工程变更通知或施工投标书相关的服务。
Preparing documents evaluating Contractor's proposals, a nd providing other services in connection with Change Orders or Construction proposals.
进行新产品BOM(物料清单)表的建立与维护,根据工程变更或相关部门要求进行更新。
Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.
项目施工中,很多风险都来自于工程变更,而承包商在整个施工过程中占有很重要的位置。
In the project construction, most risks come from engineering change, while contractors play an important position in the whole construction process.
工程变更也就是合同变更,是指对合同中的工作内容作出修改,或者追加或取消某一项工作。
The engineering modification is also the contract modification, which means that some modification, superaddition or canceling is done in content of contract.
通过对高速公路工程变更的原因进行分析,提出了一些控制高速公路工程变更的对策、措施。
The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change.
本文介绍了与工程造价相关的工程计量签证、工程变更及竣工结算审核几个环节的相关管理。
This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.
施工单位应认识到工程变更的重要性,安排高素质人员,合理运用策略,做好工程变更工作。
Construction organizations should recognize the importance of engineering change, arrange high-quality personnel, and use strategies in reason to implement the work of engineering change well.
然而,传统的工程变更管理模式是等变更事件发生后再采取措施,这往往不能起到很好的效果。
So How to manage the engineering change is attached highly importance to. But just realizing this is not enough because it will be late when the engineering change is happened.
然而,传统的工程变更管理模式是等变更事件发生后再采取措施,这往往不能起到很好的效果。
So How to manage the engineering change is attached highly importance to. But just realizing this is not enough because it will be late when the engineering change is happened.
应用推荐