• 发现状态摘要显示有未完成节点展开列表显示任何节点

    You might find that the status summary shows incomplete nodes, but when you drill down, no nodes show in the list.

    youdao

  • 通过节点之间通信消息报文格式设计完成节点之间相互协同搜索

    By the communication message format designs, the system realizes the cooperative searches among nodes.

    youdao

  • 一旦存档检查点RSS节点完成操作,停止应用任何其他日志记录服务器保持正确状态以便使用外部实用工具复制数据块。

    Once the archive checkpoint is completed in the RSS node, it will stop applying any other further log records, leaving the server in the correct state to copy the chunks by an external utility.

    youdao

  • 完成流程服务器配置作为部署管理器节点部件

    It completes the part serving as the Deployment Manager node in the process server configuration.

    youdao

  • 状态图表形式显示(11),允许展开图表查看每个状态哪些节点完成

    Status is displayed in a chart (Figure 11) that lets you to drill down to look at which nodes have completed under each state.

    youdao

  • 更改参数能够完成只是因为适用数据库节点

    Changing parameters is done just as it is for the database node.

    youdao

  • 接下来(3)处,节点处理完成调用用户出口

    Next, at point (3), the user exit is invoked after the node processing is completed.

    youdao

  • 这个处理器首先记录上报计数器接着完成节点关联任务实例

    This handler first pegs the escalation counter and then completes a task instance, associated with this node.

    youdao

  • 显然所建议协议不能确保每个节点都能真正完成工作

    Clearly, the protocol I suggest does not assure the work actually gets done on each node.

    youdao

  • 刷新状态摘要看到时间窗口内节点完成或者失败,因此不再处于未完成状态。

    When you refresh the status summary, you will find that either the node completed or failed in that window of time and is no longer incomplete.

    youdao

  • 服务器检测到这个故障自动完成工作转移另外一个节点

    The server will detect the failure and automatically submit the incomplete work to another node.

    youdao

  • 只要添加更多节点所有重要工作都会自动完成

    Simply add more nodes, and all of the important work will be done for you automatically.

    youdao

  • 现在已经完成节点1安装返回第二启动安装过程,这次安装节点2

    Now that you have finished the installation on Node1, go back to step 2 and start the installation process, this time for Node 2.

    youdao

  • 研究人员让参与者回忆学生会列出的即将上演音乐剧以及不同节点完成任务细节

    Those who took part were asked to recall small details, such as music ACTS listed to play at the students 'union and tasks completed at various points.

    youdao

  • 故障转移系统计划内计划外关闭包括完成备用节点置于在线接管处理负载任务

    Failover is the planned or unplanned shutdown of the primary system and includes the accompanying task of bringing a standby node online to take over the processing load.

    youdao

  • 删除成功完成后,节点移除IDE输出视图显示一条状态消息

    Once the deletion has completed successfully, the node is removed from the tree and a status message is displayed in the output view in the IDE.

    youdao

  • 对于同步复制目标节点接收到此写入操作,生产节点写入操作就无法完成,这样可以保证两边复制一致

    With synchronous replication, the write on the production node does not complete until it has been received on the target node, so you are guaranteed identical copies on each side.

    youdao

  • 确保志愿者都了解需要完成工作内容、时间节点

    Work plan. Make sure both you and the volunteer understand the work to be done, the timeline and when you will next check in about progress.

    youdao

  • End处理器等待所有令牌完成然后transition节点

    End handler waits until all child tokens are completed and then transitions to the next node.

    youdao

  • 完成所有Web服务路径Compute节点中的最后一步使用来自 Web服务结果更新响应消息

    When all of the Web service paths have been completed, then the final step in the compute node is to update the response message with the results from the web services.

    youdao

  • 每次完成单个路径控制返回Propagate节点后的语句原始消息(InputRoot)可用

    The original message (InputRoot) is available each time after control is returned to the statement following the Propagate node when the individual path is completed.

    youdao

  • post-reboot任务完成重新启动节点

    Reboot the node when the post reboot tasks have finished.

    youdao

  • 完成消息处理之后,可以通过 JMSOutput节点结果发送相同另一个JMS网络

    On completion of the message processing, you can send the result back to the same or to another JMS network via the JMSOutput node.

    youdao

  • 如果rac节点停止工作Oracle需要完成Oracle rac清理恢复之后才能对DTP服务进行故障转移。

    If a rac node stops working, Oracle will not failover the DTP service until the Oracle rac cleanup and recovery is complete.

    youdao

  • 节点(在这里是node1)上完成所有配置之后需要集群中的所有其他节点同步

    Once everything is configured on the primary node (node1), we need to synchronize this with all other nodes in the cluster. To do that, do the following.

    youdao

  • join节点成功完成之后控制权会传递end节点会结束这个过程

    On successful completion of join node, the control is passed to the end node, which ends the process.

    youdao

  • 允许辅助节点访问备份节点对象(必须机器完成)。

    Allow the secondary node to access objects backed up on the primary node (this has to be done on the primary machine).

    youdao

  • 分离(split)”节点表示平行传送开始,“连接(join)”节点等待所有路线完成

    A "Split" node indicates the beginning of parallel routes, and a "Join" node waits for completion of all routes.

    youdao

  • 其他硬件复制技术一样,在主动复制时,尽管备份节点IASP不可访问的,但是节点本身对于完成其他工作访问的。

    AS with the other hardware replication technologies, although the IASP is not accessible on the backup node while its actively replicating, the node itself is available to do other work.

    youdao

  • 完成这些工作之后,如果有一个虚拟节点出现问题那么它不会其他实例造成影响

    With this done, if one virtual machine or node encounters problems, it does not impact the other instance.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定