因此,在规划和实施过程中,必须采用前瞻性策略、渐进性策略、开放性策略和实用性策略以确保在建设过程的顺利完成。
Therefore, in the planning and implementation process, we must adopt policies that are forward-looking, progressive, open and practical to ensure the successful completion of the construction process.
介绍在建设虚拟智能实验室中的基本思路和实施方案。
This article introduces our main thought and intelligent the method of implementation in building virtual intelligent lab.
在建设示范应用型本科高校和实施教学质量与教学改革工程过程中,数字化教学资源建设是一项非常重要的工作。
In the process of creating demonstration application-oriented university and teaching quality engineering, digital instructional resource construction is a very important work.
地下工程项目的在建设实施过程中充满着不确定性因素(风险),其影响贯穿于项目建设的各个阶段。
The operation of underground project is full of uncertainties (risks) which influence the all stages of its construction.
在建设工程实施过程中,由于合同所引起的纠纷、索赔等问题屡屡发生,成为工程索赔的首要原因。
Many disputes and claims caused by engineering contract occurrence frequently, during the project performance, which has become the first factor of engineering claims.
在建设工程招标投标过程中,应用科学的方法进行投标决策,是我国建设工程承包业承待逐步实施和完善的重要举措。
It is urgent that the scientific decision-making methods should be used in construction project contract trade in China, which needs to be conducted and perfected.
在建设实施过程中再采用限额设计、招投标制、监理工程师制等科学手段进行过程控制,就可达到使工程成为“精品”项目,且具有竞价上网能力的目的。
If the process is controlled by quota design, competitive bidding system and supervising engineer system, the construction is able to be fine project and has logon ability wi...
在建设实施过程中再采用限额设计、招投标制、监理工程师制等科学手段进行过程控制,就可达到使工程成为“精品”项目,且具有竞价上网能力的目的。
If the process is controlled by quota design, competitive bidding system and supervising engineer system, the construction is able to be fine project and has logon ability wi...
应用推荐