• 一个真实三维结构回填沉积物

    It is an actual three-dimensional structure, backfilled with sediment.

    youdao

  • 不得回填淤泥、冻土及有机物质

    Not backfilling silt, corruption and graft, permafrost soil organic matter.

    youdao

  • 它们可以回填混凝土灰泥里面牛肉他们

    They can be backfilled with concrete or plastered on the inside to beef them up.

    youdao

  • 补充可以采矿时将石头的石头回填

    Added: You can craft Destroyed Stone to backfill holes while mining.

    youdao

  • 生存偏差去掉了那些糟糕记录,回填误差加入了一些好的记录

    You've got survivorship bias taking out bad records and then you've got backfill bias adding good records.

    youdao

  • 这个是近代的,被回填一部份然后巧妙利用

    The crafty using of the rob hole to put the wiring.

    youdao

  • 皂化粉煤灰可以用做桥头等高填土路段回填材料。

    Saponification slag-fly ash can be used in the high fill sections of highway.

    youdao

  • 待涵管道安装完成经验合格方可进行土方回填

    To pipe installation is complete and experience the qualified, conducted only after backfill earthwork.

    youdao

  • 场地清表、地基处理、初平平、开挖回填压实

    Site stripping, subgrade preparation, rough and finish grading, excavation, backfill and compaction.

    youdao

  • 高速公路构造物台背回填质量关系到高速公路整体质量。

    The quality of freeway structure retailing backwall refilling concerns the freeway global quality.

    youdao

  • 所以生存偏差回填偏差,对冲基金领域一个相当重大问题

    So the survivorship bias and the backfill bias would be much, much more of a problem in the hedge fund world.

    youdao

  • 土方开挖回填相应安全措施,要严格按规范施工。

    Earth excavation and backfill is to have the appropriate security measures to strictly regulate the construction.

    youdao

  • 管子下入管沟后,侧铲推土机装有回填附件的拖拉机回填管沟。

    Backfilling the trench following the lowering-in of the pipe is carried out by angledozers or backfilling attachments to tractors.

    youdao

  • 其后,管道回填需要特别注意,应提供需要的水平支撑

    Consequently the bedding and backfilling of the trench need special attention to provide the required lateral support.

    youdao

  • 其实失败经理人超过130位,因为除了生存偏差之外,还有称为回填偏差的影响

    Now,more than 130 managers failed because, in addition to survivorship bias, there's something called backfill bias.

    youdao

  • 山区发电工程建设工程许多项目涉及碎石回填土的边坡地基问题。

    In power project construction in mountainous areas, many are concerned of gravel backfill soil slopes and treatments.

    youdao

  • 大多数会选择同样情绪回填口井继续愤怒沮丧着即使间隔数载。

    Most of us simply refill the well with the same feelings and we continue to be angry or frustrated even though the experience or situation is long gone.

    youdao

  • 分析这个特定的样本,估算生存偏差每年达到4.4%,回填偏差每年达到7.3%。

    Looking at this particular group, he estimated survivorship bias to be 4.4% per year and backfill bias to be 7.3% per year.

    youdao

  • 道路工程施工,路基工程施工完毕设计要求完成土方回填

    Before road works starts, the underground piping works under the road foundation should have already completed and backfill should have also completed according to design requirements.

    youdao

  • 我们情绪就这样由恼怒演变忧伤,而那些消失时,我们回填愤怒憎恨

    We go from feeling angry and annoyed to sad and miserbable and when that goes we fill it back up with anger and hate.

    youdao

  • 一个主意有人主张过滤同时,正在回填防止出来立场基地

    Its a good idea to have someone stand in the filter while it is being backfilled to prevent it from shifting out of position on the base.

    youdao

  • 回填不仅提高了边坡稳定性转入地下开采提供了所需安全覆盖层厚度

    The back filling at the slope bottom not only enhances slope stability, but also provides the safe overlay which is needed in underground mining.

    youdao

  • 实践证明采用注浆技术采用回填方法加固具有质量,效率成本低等特点

    The fact shows that grouting technique has characters of better quality, higher efficiency and less cost compared with refilling method.

    youdao

  • 泡沫混凝土在岸用作轻质回填材料降低垂直减少对岸侧向载荷

    Foam concrete wall used for light bet backfilling materials can reduce the vertical section load, also reduced the wall lateral load of the other side.

    youdao

  • 回填地区进行管道施工根据回填性质,对管底及管顶的回填土进行处理

    During the pipeline construction in backfill soil area it is needful to treat backfill soil around pipeline according to property of backfill soil.

    youdao

  • 混凝土护栏建造1至5米回填成的5不同方案中脱颖而出,最佳方案

    Sand DAMS, which are constructed out of concrete barriers 1-5m high and backfilled with sand, were voted as the best idea from five different proposals.

    youdao

  • 混凝土护栏建造1至5米回填成的5不同方案中脱颖而出,最佳方案

    Sand DAMS, which are constructed out of concrete barriers 1-5m high and backfilled with sand, were voted as the best idea from five different proposals.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定