• 在建设过程中,有时需要征用财产转移人口由于合同价值极高投标程序往往具有很强竞争性

    Property expropriation and population resettlement is occasionally required, and the bidding process is often fiercely competitive, given the high value of the contracts.

    youdao

  • 宣称国际铁路顾问公司合同投标期间同时欧洲之星西门子提供咨询服务。

    It claims that Interfleet had been advising both Eurostar and Siemens at the time of the contract.

    youdao

  • 合同接受合同变更投标之前合同标书的所有要求进行评审

    The contract or bidding documents shall be reviewed prior to acceptance or amendment, or tendering.

    youdao

  • 工程量清单连同投标须知、合同通用专用条件技术规范以及图纸一并进行阅读

    The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and Special Conditions of Contract, Technical Specifications, and Drawings.

    youdao

  • 标书文件通常包括合同条件规范图纸、工程量表、标书表格投标须知

    Tender documents normally comprise Conditions of contract, Specification, Drawings, Bill of Quantities and form of tender, together with Instructions to Tenderers.

    youdao

  • 工程项目费用承包存在着一定风险这些风险集中体现工程投标阶段、工程合同签订阶段工程施工阶段

    A certain risk would be in the charge-contract of engineering project, and would be incarnated centrally in the stages, such as engineering bid, engineering contracting, and constructing etc.

    youdao

  • 建筑作品作者发表权方面通过投标过程委托设计合同履行过程分析,对作品披露时间确定提出了自己的见解。

    In the aspect of publication right of architectural works, the author argues about the disclosure timing through analyzing the process of bidding and the performance of entrustment contract.

    youdao

  • 建设工程招标投标作为竞争性缔约方式,具体包括建设工程招标投标开标、评标、定标签订合同诸程序

    Construction Project Tendering, as means of competing engagement, consists of the stages of tender inviting, tender submitting, tender opening, tender evaluating and determining, and contract signing.

    youdao

  • 作为承包商应该了解掌握项目风险来源性质发生的规律尤其项目的投标合同阶段实行有效管理

    As a contractor, it is necessary to learn about source of project risks, nature and rule of occurrence, especially in the bidding and contract period, effective management shall be available.

    youdao

  • 正式合同制定签署前投标连同贵方书面中标通知书视为约束我们双方合同

    Until a formal contract is prepared and executed, this Bid, together with your written acceptance thereof in your Notification of Award, shall constitute a binding contract between us.

    youdao

  • 国际工程投标阶段承包合同管理目标进行探讨主要内容如何争取中标怎样商签承包合同

    This paper probes into the target of the contract management in tender stage of international engineering, the main content of which is how to win the bid and how to sign the contract.

    youdao

  • 海外工程合同中的保函主要投标保函预付款保函、履约保函保留金保函。

    Guarantees for overseas engineering contracts fall into four major types: bid guarantee, advance payment guarantee, performance guarantee and retention money guarantee.

    youdao

  • 正式合同制定签署之前投标连同书面授标通知成为约束我们的合同

    Until a formal contract is prepared and executed, this bid, together with your written acceptance these of in your Notification of Award, shall constitute a binding contract between us.

    youdao

  • 标书原本两个副本打字不能抹掉墨水书就,并一名或多名有权责成投标遵守合同人士签字

    The original and two duplicate copies of the tender shall be typed or written in indelible ink and shall be signed by a person or persons duly authorised to bind the tenderer to the Contract.

    youdao

  • 标书应该符合《投标说明合同中的条款条件”的要求。

    The tender shall be governed by the Instruction to tender and the Terms and Conditions as set out in the Contract Form.

    youdao

  • 参与项目全面工作计划年度工作计划包含投标合同签订活动执行情况监督整个过程

    Participate in the entire cycle of project tendering, contracting and monitoring process of activities included in the Overall Work Plan and successive Annual Work Plans.

    youdao

  • [摘要]投标价格评审工程合同形成执行过程中的关键工作,直接影响合同合理确定有效执行。

    Abstract: Bid price evaluation is the key process throughout the contract life cycle, and it directly influences the signing and execution of contract.

    youdao

  • 原本两个副本打字不能抹掉墨水书就,并一名或多名有权责成投标遵守合同人士签字

    The original and two duplicate copies of the tender shall be typed or written in indelible ink and shall be signed by a person or persons duly authorized to bind the tenderer to the Contract.

    youdao

  • 合同条款投标者提出单价总价可执行合同过程中进行调整

    Price adjustment provisions applying to the period of execution of the Contract shall not be taken into account in tender evaluation.

    youdao

  • 关于以上投标供应商的货物我们根据合同条款GCC第33规定做出完整保证保修

    We hereby extend our full guarantee and warranty as stated under GCC Clause 33 of the General Conditions of Contract, with respect to the Goods offered by the above Tenderer.

    youdao

  • 建议承包商合同进度表投标价格分析完成之前,仔细阅读理解包括合同条款图纸内容详细说明。

    Specifications together with the Conditions of Contract and Drawings prior to completing the Schedules and Breakdown of Tender Prices of the Contract Documents.

    youdao

  • 建议承包商合同进度表投标价格分析完成之前,仔细阅读理解包括合同条款图纸内容详细说明。

    Specifications together with the Conditions of Contract and Drawings prior to completing the Schedules and Breakdown of Tender Prices of the Contract Documents.