你要评估那些剩余的工作,看看项目是否可以按照初始计划中估算的工时、成本以及期限完成。
You'll evaluate the remaining work to see if the project will be completed within the original effort, cost, and duration plans.
美国核管理委员会(NRC)为本国核电站颁发了延期运行的许可证,而这些核电站的初始许可期限为40年。
The Nuclear Regulatory Commission has been handing out 20-year extensions to plants, whose original licenses were for 40 years.
结果表明:初始误差和随机误差对可预报期限影响所起的作用大小主要取决于两者的相对大小。
When the magnitude of initial error is much greater than that of random error, the predictability limit of two systems is mainly determined by initial error.
结果表明:初始误差和随机误差对可预报期限影响所起的作用大小主要取决于两者的相对大小。
When the magnitude of initial error is much greater than that of random error, the predictability limit of two systems is mainly determined by initial error.
应用推荐