介绍工程项目全过程造价控制的意义及各阶段的控制方法。
The paper exhibits the significance of whole-process cost control of engineering project and the control methods in each phase.
摘要:市政基础设施项目建设工程造价的控制与管理贯穿于工程建设的全过程。
Abstract: : the control and management of the cost of construction of municipal infrastructure projects throughout the whole process of construction projects.
建设项目工程造价的控制是一个贯穿项目建设全过程的复杂的系统工程。
The control of engineering cost of construction item is a complex system engineering that penetrates the whole process of construction.
建设项目工程造价的控制是一个贯穿项目建设全过程的复杂的系统工程。
The control of the construction cost of the construction project is a complex system engineering that penetrates the whole course of the construction of the project.
本文结合工程造价管理经验,从投资决策阶段、设计阶段、施工阶段阐述了如何对工程造价进行全过程控制。
The total process control of engineering cost management is discussed by three stages of investment decision, design and construction.
文章通过对工程造价全过程管理控制的分析论述,找出对工程造价全过程管理控制的重点及内容、主要方法等,旨在实现造价全过程控制。
Through the analysis of the process management and control of construction cost, the article works out the focal points and contents as well as the main methods for this work.
本文在分析了工程建设实施的各个阶段如何有重点地控制工程造价后,指出目前实现全过程造价管理还存在的弊端以及发展前景。
This paper analyzes how to control engineering costs at various stage of engineering construction and indicates the abuse in that process and the prospect of development.
本文论述了工程造价控制的主要问题,并详细的分析了工程项目造价全过程控制的重点。
This paper discusses the key issues of cost control, and detailed analysis of the whole process of project cost control focus.
为完整而有效地控制工程造价,应对影响工程造价的三个阶段实施全过程控制。
For whole and effective controlling engineering cost it is needful to implement all process control to three sections of influence engineering cost.
本文分析了目前我国公路建设造价控制和管理中存在的问题,并提出了对公路工程造价进行全过程管理的相关策略。
Current China's road construction cost control and management problems are analyzed and related strategies for highway project cost of the whole process management are proposed.
通过实施全过程控制来保证对建设单位有效控制工程造价。
Thus, the efficient control of project cost for construction units can be guaranteed through implementing whole course control.
合理确定有效控制造价,必须按基本建设程序办事,以设计为重点进行全过程的造价控制和科学管理。
In must be follow basis construction program if want to logical confirm effective control cost, base on design as key point take full process cost control and science management.
工程造价控制是建设管理的一个核心部分,它始终贯穿于工程建设的全过程,即体现在对工程建设设计、施工再到竣工交付使用前所需全部建设费用的确定、控制、管理。
The engineering cost control is the core of construction management, It runs through the whole process of construction and includes the determination, control and management of the construction cost.
公路工程建设管理的重要组成部分之一是公路工程造价的有效控制,公路工程造价控制贯穿于公路建设全过程。
One part of highway engineering construction management is the effective control of highway engineering cost throughout the highway construction.
在我国加入WTO后,面临着如何与国际惯例接轨,进行全过程造价管理和控制的重要课题。
After our country join WTO, face how to BE in line with international usual practice, important topic that carry on the whole process to build the price management and control.
基本建设的造价控制应注重全过程的动态控制。
The cost control of capital construction ought to lay stress on the dynamic control in the whole process.
造价控制贯穿于工程项目建设的全过程,阐述了设计阶段、招标投标阶段、施工阶段和竣工阶段控制工程造价的措施。
Cost control runs through the whole process of construction projects. The cost control measures of design phase, bidding phase, construction phase and completion phase of construction are described.
针对问题,本文指出:工程造价控制必须采用全过程动态控制。
To solve those problems, the author states that: there should be a dynamic management of the overall project cost control.
针对问题,本文指出:工程造价控制必须采用全过程动态控制。
To solve those problems, the author states that: there should be a dynamic management of the overall project cost control.