• 新增变电能力完成了75000目标

    Megavolt Ampere of transformation capacity achieved the target of 75,000 MVA.

    youdao

  • 尼尔公司表示因为争吵建设发电站计划推迟了因为三分之一能源来自d - 6,这些发电站可以产生所需的三万的电力。

    Anil's company says the dispute has delayed by four years a plan to build power plants that could generate more than 30,000 much-needed megawatts, since a third of the fuel would come from D-6.

    youdao

  • 新增变电能力达79522,超额完成75000目标

    Megavolt Ampere (MVA) of transformation capacity against a target of 75,000 MVA.

    youdao

  • 确实它的一个优势;双核处理器的系统运行起来依旧磕磕绊绊之相反是流光(Lumia单核高达1.4赫兹高通处理器却从来没有出现过半的卡屏。

    And it's true; dual-core Android phones still stutter, and the Lumia's single-core 1.4GHz Qualcomm processor never shuddered for a second.

    youdao

  • 我们看到现场正在吊装风机以及正在的第二台50变压器

    We observed both the erection of new turbines, and an additional 50 MVA transformer being installed and waiting to be connected.

    youdao

  • 我们看到现场正在吊装风机以及正在的第二台50变压器

    We observed both the erection of new turbines, and an additional 50 MVA transformer being installed and waiting to be connected.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定