结合工程实例进行了验证,说明改进的规范法计算公式在工程实践中有较强的实用性,且计算沉降量比较接近实际观测值。
The engineering examples show that the improved specification settlement calculation formula is practical and the settlement calculation values are close to the observation values.
本文对求工程特征值问题的矩阵反迭代法作了改进。
New algorithm of matrix inverse iteration on the eigenvalue problem are presented in this paper.
本文应用有限元法分析了一系列软土基坑工程典型实例,根据计算结果和实测值提出了软土基坑墙后地表沉降的概化分布曲线。
After analyzing a serial of samples by FEM, studying their calculated and practical data, this article gives a typical distribution curve of the surface settlement behind the retain wall.
研究结论:挣值法可运用于土地开发整理工程成本偏差分析。
The paper concludes that earned value method can be applied in the analysis of the total cost variance in land development and consolidation projects.
当工程网络计划中活动持续时间为已知的确定值时,关键路径法被证明为是一个网络计划的有效方法。
When the durations of activities in a planning network are precisely known, Critical Path method has been proved to be a effective method to make planning.
[10]郭显光。改进的熵值法及其在经济效益评价中的应用[J]。系统工程理论与实践,1998,(12):98~102。
[GUO Xianguang. Appli-cation of improved entropy method in evaluation of economic res ult[J]. System Engineering Theory&Practice, 1998, (12):98~102. ].
研究了一种适于工程实践的多变量稳定裕度法——基于回差矩阵奇异值的稳定裕度分析法。
The margin is evaluated by the minimum singular value of return deference matrix of system.
而同时实现这两个目标的重要手段就是通过挣值法对工程项目费用与进度进行协调控制。
But the important means to achieve these two objectives at the same time is the Earned Value Method which is mean of project cost and schedule co-ordinate control.
传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。
Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.
传统挣值法主要适用于工程量清单合同条件下施工单位项目管理活动。
Abstract: The traditional Earned Value Method(EVM) is mostly used at the condition of BOQ.
应用推荐