本文运用模糊数学的方法,提出一种单台机器多目标作业排序的算法。
Application of fuzzy mathematics method, this essay presents an algorithm to solve single machine sequencing problem with multiobjectives.
作业排序与作业计划是服务业、运输、科研以及各种企业生产中普遍遇到的问题。
Job sequencing and job plan problem are general problem in service, carrying trade and all kinds of enterprise producing.
车间调度是一类作业排序问题,对于在现有资源条件下提高工作效率和经济效益有重要作用。
The job scheduling is a kind of job sequencing and important to advance work efficiency and economic performance.
改进策略运用到的方法包括需求预测方法、粗能力计算方法、作业排序法、物料ABC分类管理法等。
The methods used in the improvement measurement includes demand forecasting, rough capacity planning, work job queuing method, ABC material management, etc.
介绍了带有限期作业排序问题的概念,以及使用贪心方法求解此问题的一般算法和一种改进的快速算法。
This paper introduces the concept about the question of job scheduling with time limit, a general method of solving this question using greedy method and a fast algorithm which is improved.
大多数一般的多于两台机床的流水车间作业排序问题均属于NPC问题,在实际生产中一般采用启发式算法。
Most flow shop sequencing problems with more than two machines belong to NPC problem. People often use heuristic algoristic algorithms to deal with them in practice.
针对作业排序问题求解过程复杂、结构性差等特点,本文提出一种基于知识推理的专家系统模型,以实现作业排序问题的求解。
Operation scheduling is a complicated task with semi-structured character. In this paper, the expert system model using knowledge reasoning for operation scheduling is given.
文章针对基于JIT思想建立的一种批量计划和作业排序集成问题,建立整体模型,设计了一种启发式算法采用集成方法求求解。
A monolithic model of the lot-sizing and scheduling problem based on the JIT strategy has been proposed in this paper, and a heuristic algorithm using integrated method has been designed to solve it.
清单19显示了最终的ps例子,其中使用作业的格式列出了所有进程,并且根据会话id和命令名对输出进程排序。
Listing 19 shows the final ps example where all processes are listed using jobs format, and the output is sorted by session id and command name.
在允许作业柔性加工的基础上,本文提出一种新的两目标机器加工排序问题。
In this paper, we propose a new machine process sequencing problem with two objectives considering the operation flexibility.
该作业计算在最近6 个月的时间里,一般或高优先级订单中通过邮寄或海运发货的行项目的数量,并将这些数量按订单优先级排序。
The job counts the number of line items shipped by mail or sea within the last six months that are part of normal or high-priority orders, and breaks the counts down by order priority.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
这份行事历提供依时间排序的授课之主题与作业。
This calendar provides the course's lecture topics and homework assignment due dates.
并将这一联系数与态势排序表相对照,来判断工序作业时间的联系数所处的态势级,从而得出实现该工序的可能性。
Comparing this connection number with state sort table the grade of a working procedure's connection number is judged, then the possibility of this working procedure is got.
本学位论文对面向成套订单的流水作业和多目标排序问题做了一些基础性的研究。
This paper proposes a multi objective model to the coordinated planning of production and jobs delivery based on the whole set orders.
您可以使用宣告方式撰写一般进行撷取、筛选、排序以及分组资料作业时所需的一切条件。
You can declaratively write all the conditions that are required for typical scenarios such as retrieving, filtering, ordering, and grouping the data.
新的排序或筛选作业会重新整理此基础清单。
The underlying list is refreshed by a new sorting or filtering operation.
新的排序或筛选作业会重新整理此基础清单。
The underlying list is refreshed by a new sorting or filtering operation.
应用推荐