本文研究一种混联水电站水库群中长期优化调度的多维动态规划模型的求解方法。
In this paper a resolving method of multivariate dynamic programming model to mid and long term optimum operation for large scale hydropower system is studied.
在阅读和研究大量水库调度领域文献的基础上,研究了中长期优化调度以及发电调度风险评估问题。
Based on reading and studying large number of literatures about reservoir scheduling, the long-term optimization scheduling problem and the scheduling risk assessment are studied.
建立了梯级水电站中长期联合优化调度模型,并采用逐步优化算法对其进行求解。
A model of mid-long term optimal dispatching of cascade hydropower stations is established and a solution is given using progressive optimality algorithm.
以黄河上游梯级水电站群为例,考虑水电站水库已备有的短期或中长期预报方案,建立其优化调度模型。
The long-term optimal operation model is established for Baishan Hydropower Plant and the model is solved with POA algorithm.
以黄河上游梯级水电站群为例,考虑水电站水库已备有的短期或中长期预报方案,建立其优化调度模型。
The long-term optimal operation model is established for Baishan Hydropower Plant and the model is solved with POA algorithm.
应用推荐