• 施工道路分期分层布置

    The access road to the dam was arranged by stages and layers.

    youdao

  • 试验采用爆破松动砒砂岩,推土机运料上坝碾压施工方法

    The tested dam used the method of demolishing for loosing, materials carried by bulldozers and roller compaction after.

    youdao

  • 结果表明宝山矿区选矿水污染饮用水上坝消化道肿瘤高发密切关系

    Results There was close relationship between the incidence of enteron tumors in Shangba Village and the drinking water polluted by the Dabaoshan mine.

    youdao

  • 扎渡水电站地段的河谷系数施工条件道路布置困难

    The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.

    youdao

  • 因此合理填筑规划上坝道路布置确保施工关键技术问题

    Therefore the proper plan of the filling of dam body and the arrangement of access roads to dam crest are the key problems to ensure the strength of construction.

    youdao

  • 通过填筑禁止上坝垫层兼顾水性稳定性等措施,冬季可以施工

    By means of thin layer of filling, prohibition filling frozen block, taking cushion material both with drainage and stability, construction could go on in winter days.

    youdao

  • 动态的解决好物料合理调配问题,研究物料上坝运输的机械配置、道路情况水布垭面板堆石施工规划重要问题。

    It is important to allocate resources, scheme machines and roads efficiently in real-time in Qingjiang River rockfill Dam's construction.

    youdao

  • 篇文章介绍橡胶橡胶渡槽应用

    This article introduces the application of rubber cloth on the rubber aboideau and aqueducts.

    youdao

  • 古镇:尧古镇离泸州22公里,位于四川贵州边境

    Ancient Town of Yaoba: 22 kilometers (14 miles) from Luzhou City, Yaoba lies at the border area between Sichuan and Guizhou.

    youdao

  • 由于8月间一起事故,印度河洪水实际一分为二——一部分注入下游印度河,另一部分蔓延至西侧广大农田区。

    Following a dam failure in August, the Indus river essentially split in two, sending some water downstream on the Indus, and some water over vast stretches of agricultural land west of the river.

    youdao

  • 水布垭面板堆石目前世界最高的面板堆石

    Shuibuya dam is currently the highest concrete face rockfill dam in the world.

    youdao

  • 随着科学技术进步,世界修建日益增多,随之而来的高速水流问题也就越来越多。

    With the developing of science and technology, more and more high head dams are build and problems brought by high velocity flow are following.

    youdao

  • 因此对大型结构分析软件ANSYS三维非线性计算功能进行了深入研究,此基础完成了基于非线性有限单元稳定计算分析。

    Basic theory of nonlinear FEM analysis and its realization in ANSYS were studied. Accomplish stability analysis of high arch dam abutment based on nonlinear FEM analysis.

    youdao

  • 世界最大三项人造工程中国长城埃及金字塔阿斯旺埃及。

    Three of the biggest man-made projects in the world are the Great Wall of China, the Pyramids of Egypt and the Aswan High Dam, which is also in Egypt.

    youdao

  • 分析地震尾矿造成破坏特点的基础介绍了尾矿地震稳定性分析方法

    Based on the broken characteristics about earthquake to tailings DAMS, the earthquake stability analysis methods for tailings DAMS are introduced.

    youdao

  • 研究碾压混凝土重力失稳破坏机理基础提出准弹性准则作为碾压混凝土重力设计准则。

    Based on the study of the failure mechanism of RCC gravity DAMS, the hypoelastic criteria are proposed as the design criteria of RCC gravity DAMS.

    youdao

  • 基础不同工况条件下进行液化安全评价抗震稳定性分析。

    Based on this, the evaluations of anti liquefaction and earthquake have been made for the dam in different conditions.

    youdao

  • 施工地质工作基础,对叶口水库工程面板堆石进行工程地质评价

    On the basis of construction geology works, the engineering geology assessment is carried out for the dam base of Baiyekou Reservoir in this paper.

    youdao

  • 覆盖地基修建,其防渗体系可靠性一项关键技术问题

    The reliability of seepage prevention system is a key problem for high rockfill dam built on the foundation of large overburden depth.

    youdao

  • 进行中间包挡墙模型实验,分析方案冶金效果此基础提出优化设计方案

    By water simulation experiment on tundish dam and weir, metallurgical effect of the original design is analyzed and the optimal design scheme is offered based on these researches.

    youdao

  • 基础结合实际提出了针对该尾矿安全高效运行几点技术措施

    On these basis and combined with reality, several technical measures for safely and highly efficient running of high dam are put forward.

    youdao

  • 通过实例计算分析,表明复盖层分布堆石地震响应影响较大

    Through calculation and synthetical analysis, the paper draws conclusions about earthquake response of rockfill DAMS on deep overburden.

    youdao

  • 应用结构塑性极限分析下限定理相应有限元分析重力极限承载能力判断稳定性

    The upper bound and lower bound theorem of classical plasticity theory and corresponding FEM is applied to analyze the bearing capacity of gravity dam for judging the stability of the dam.

    youdao

  • 在分析基础提出漫水流速计算办法

    Then, the calculating method of initial scour velocity of bed sand around submerged spur dikes is suggested.

    youdao

  • 地震烈度修建深厚覆盖层的高土面临许多问题动力稳定液化问题

    To build high earth-rockfill dam on thick moraine cover foundation in high earthquake intensity region will face many new problems such as dynamic stability, dam foundation liquefaction etc.

    youdao

  • 分析清江暴雨洪水特性基础,介绍了水利枢纽设计洪水计算方法及其主要成果

    On the basis of analysing storm flood characteristics of Qinjiang River, the method and main results of design flood calculation for Gaobazhou Project are presented.

    youdao

  • 以往水电站建设当中重力大都选择新鲜完整程度好的岩体,岩体质量较高

    Middle the former hydroelectric station construction, the gravity dam mostly chooses on new and the complete rock mass, the rock mass quality is high.

    youdao

  • 收集工程地质勘察资料基础,对水库质量主要工程地质问题进行了评析。

    Based on collecting the data of the engineering geological exploration, this paper comments on the quality and main engineering geological problems of the subsidiary dam of Shencun Reservoir.

    youdao

  • 以往工界应力研究较多,对拱座稳定滑失研究较多结构稳定则少有研究。

    Anciently, study on dam body stress, abutment stability and up-glide stability is rather abundant by the dam engineers, but quite few on structural stability of dam body.

    youdao

  • 紫坪铺水利枢纽工程位于四川省西部岷江映秀至都江堰市沙金河段

    Zipingpu Multi-purpose Dam Construction Project is located at Yingxiu-Dujiangyan reach, upstream of Minjiang river, west Sichuan.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定