• Enacting the construction contract condition of the construction engineering, which is suitable for the valuation system of the list of engineering amount.

    制定与工程量清单计价体系适应建设工程施工合同条件

    youdao

  • In principle, content and method, the valuation method of engineering volume list (EVL) is quite different from the previous one which adopted quota valuation mode.

    工程量清单计价原理内容方法上与原有定额计价模式相比很大差别。

    youdao

  • With the entry to the WTO, valuation of construction engineering in China is converging to-ward the international mainstream, adopting valuation based on engineering quantity list.

    随着我国加入世界贸易组织,建设工程计价国际接轨,全面实行工程量清单计价已大势所趋。

    youdao

  • This paper has divided the internal control environment into seven aspects and made detailed list of instructions to investigation and valuation inside each aspect.

    对于内部控制环境细分七个方面一方面需要调查的问题评价的项目进行了详细

    youdao

  • This paper has divided the internal control environment into seven aspects and made detailed list of instructions to investigation and valuation inside each aspect.

    对于内部控制环境细分七个方面一方面需要调查的问题评价的项目进行了详细

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定