Minimum 10 years work experience, with at least 3 years of utilities system and project management.
具有10年以上工作经验,且至少3年以上公用工程系统和工程项目管理的经历。
Examples of low temperature waste heat utilization in Dalian Company are introduced, e. g, heat integration between unit and unit, units and system utilities, system and system as well.
介绍了大连石化分公司低温余热利用的几个实例,包括装置与装置之间的热联合、装置与系统公用工程之间的热联合及系统与系统之间的热联合等。
Examples of low temperature waste heat utilization in Dalian Company are introduced, e. g, heat integration between unit and unit, units and system utilities, system and system as well.
介绍了大连石化分公司低温余热利用的几个实例,包括装置与装置之间的热联合、装置与系统公用工程之间的热联合及系统与系统之间的热联合等。
应用推荐