In the no ground monitoring information area, we will use basic unit grid.
没有地面监测信息的区域,采用基本单元网格管理。
Further divide the page into uniform parts and you've created a multiple unit grid.
通过把页面均分为几个等份,来创建多个单元格。
A newsletter consisting of mostly small articles or "news briefs" and photos could use a 6(2x3), 9(3x3), or 12(3x4) unit grid of rectangular or square units quite nicely.
一份简报包含了众多短文,以及“新闻提要”和照片,采用一套6(2x3)、9(3x3)或是12(3x4)矩形或方形单元格的网格系统会很方便。
The runclient.sh script can also be used to run the sample against a remote grid by providing the hostname and port to the processing unit grid's catalog service as a single parameter.
sh脚本也可用于针对一个远程网格运行样例,方法是将主机名和端口作为单个参数提供给处理单元的目录服务。
You don't have to fill every little grid unit.
你也不需要填满每一个小单元格。
In some unique cases, you might want grid units nested within a parent grid unit.
在少数情况下,你可能需要将一个网格嵌套在另一个网格里面。
You don't have to always fill the entire grid unit either.
你也不必总是占满整个单元格。
Besides incremental improvements on the Grid and unit testing support, we also have some big new features planned.
除了在Grid和单元测试方面的改进外,我们还规划了一些重大的新特性。
Jug kettles are fast and convenient, but their fuel - electricity from the national grid - produces almost three times more greenhouse gas for each unit of heat than burning gas in the home does.
电热水壶烧水快而且方便,不过它们的燃料——来自全国电网的电——产生每单位热量所排放的温室气体是自己在家烧煤气的3倍。
The first parameter (1000) specifies the grid cell size in meters, because that is the linear unit of the SRS associated with the location column.
第一个参数(1000)以米为单位指定网格单元格大小,因为米是与location列相关联的SRS的直线单位。
The pages, below, are examples of how you might combine text and graphics in a 7-unit vertical grid (such as for a newsletter).
下面的页面范例,显示了如何在一个7列的垂直栅格中进行一份新闻简报的图文混排。
Grid structure perspective drawing: to enquire by the grid level structure of electricity supply unit substation line substation area etc.
电网结构透视图:按照供电单位、变电站、线路、台区等电网层次结构进行杳询。
On the basis of modeling, simulation and field test, proposed are the PID parameter setting range of the governor under the large grid operating condition, and the power control mode of the unit.
通过建模、仿真及现场试验,提出了机组并联于大电网工况下的调速器PID参数整定范围和应有的机组功率控制模式。
VO(Virtual Organization) is the basic management unit of grid computing, and coordinative computing group is the base of VO.
虚拟组织是网格计算的基本管理单元,而协同计算组是虚拟组织形成的基础。
The biggest starting current unit for rated current operation unit nearly 1.5 times, which reduces the unit to start the impact of the power grid.
机组的最大启动电流近为机组额定运行电流的1.5倍,从而降低了机组启动对电网的冲击。
Finally, the grid division of the computational model is completed using the reduced integral unit, and the explicit integral is introduced to complete the calculation.
最后,运用简缩积分单元对计算模型进行网格划分,采用显式积分方法完成计算。
Nuclear power plants and thermal power plants are very similar to the data interface of the unit to the power grid.
核电厂与火电厂,在机组对电网的数据接口上极为相似。
Taking engineering as unit, united spatial base being supplied, vector-grid basic spatial data was managed wholly.
以工程为单位,在统一空间基底的前提下,对矢量栅格基础空间数据进行一体化管理。
From the data collection, to the triangle network topology construction, and the formation of grid unit, finally obtained the coal geology, accurate elevation revealed.
从数据的采集,到三角网的构建,以及拓扑结构的形成,最后得到网格单元,准确的把煤炭地质高程显现出来。
By means of BFCT, a three-dimensional physical space with arbitrary configuration can be transformed into standard cube, forming the unit cubic grid.
利用三维边界拟合坐标变换技术,可将具有任意曲面边界的三维物理区域变成长方体计算区域,在该区域中形成单位立方体差分网格。
AC fault security power source system is to provide alternating current for unit safety shutdown when power cut happens for a long time due to power grid failure or other reasons.
交流事故保安电源系统是当电网发生事故或其他原因致使火电厂厂用电长时间停电时,提供机组安全停机所必需的交流用电系统。
The results show that the harmonic pollution of power grid is the basic reasons leading to the unit interconnected failure and the proposed measure is effective.
结果表明,电网谐波污染是机组并网失败的根本原因,并验证了该措施行之有效。
The unit, the letter read, was needed to maintain grid stability, and E. on was to reestablish the coal plant's operational readiness without delay.
信上要求机组需要用来维持电网的稳定性,E。ON需要刻不容缓地重新做好燃煤电厂的运行准备。
In this paper, the optimization of primary frequency regulation method in management system and technology criterion for thermal power generating unit of Shandong grid is described.
叙述了山东电网从管理制度和技术规范两方面着手,对火电机组进行优化整改的经过。
Adding a grid to the dense phase of the regenerator is an effective method to raise the regenerating capacity of a heavy oil catalytic cracking unit.
再生器密相中增设格栅是提高重油催化裂化装置再生能力的有效措施。
Using this formula, then obtains the real cumulative time cost grid chart again through the grid calculator, Fundamental unit for minute.
运用此公式,再通过栅格计算器即可得到真实的累积时间成本栅格图,基本单位为分钟。
It completed performance testing of current, voltage, and other precision testing, in the control unit and hardware-assisted complete circuit of the power grid failures test.
它完成性能测试中的电流、电压等精度测试,并且在控制单元硬件电路的辅助下完成电网故障测试。
Adjacent to the table is the third unit which contains a belt conveyor, a grid trimming die and another belt conveyor.
与工作台相邻的第三个装置,包括传送带,板栅修边用模具和第二条传送带。
The specially designed grid case gives optimal performance and cooling of the components inside the unit.
特别设计的网格中提供最佳的性能和在单位内的组件冷却。
The specially designed grid case gives optimal performance and cooling of the components inside the unit.
特别设计的网格中提供最佳的性能和在单位内的组件冷却。
应用推荐