• Shield tunneling method has become a primary method in underground excavation with its predominance, earth pressure balanced shield tunneling (EPBS) is the most universal type in our country.

    盾构隧道法开挖凭借自身的优势成为城市地下施工的主要手段,其中土压平衡式盾构目前在国内使用较为普遍。

    youdao

  • This paper puts forward the concept and method about the network graphics of underground excavation cluster of hydropower station firstly.

    本文首先提出了水电站地下洞室群空间网络图化的概念和方法。

    youdao

  • Because of the poor strength and the typical creep character of the soft rock, it is difficult to excavate and support the underground excavation.

    软岩强度低,且具有明显的蠕变特性,常给地下巷道的开挖和支护带来很大的困难。

    youdao

  • Based on the in situ measurement, this paper discusses the key problems which effect the deformation and stability of underground excavation pit in Shanghai soft soil.

    本文依据现场测量论述了影响上海软土深基坑变形和稳定的关键问题。

    youdao

  • The influence of the groundwater, seismic loading and the coupling of the two on the mechanical behavior of the underground excavation in the jointed rock mass is investigated.

    本文主要讨论地下水、地震荷载以及地下水与地震耦合作用对节理岩体中地下洞室围岩力学响应的影响。

    youdao

  • As a result, the deployment of the design method of the hydropower plant ventilation and air conditioning systems in the underground excavation cluster has great practical meanings.

    所以展开水电站地下洞室群通风空调系统的设计方法的研究具有现实意义。

    youdao

  • Oriented toward the development of a 3D visual modeling system for geological and mining engineering, a voxel- based algorithm for computing underground excavation volume is proposed.

    根据地矿工程体视化仿真系统研究工作的需要,提出了一种基于体素的地下采掘工程量的计算方法。

    youdao

  • Underground excavation leads to surface subsidence. Once the surface deformation value exceeds a certain limit, the railway in surface subsidence area will be seriously damaged.

    地下开挖工程导致地表沉陷,一旦地表变形值超过一定界限时,地表沉陷区内的铁路就会受到严重破坏。

    youdao

  • Underground excavation leads to surface subsidence. Once the surface deformation value exceeds a certain limit, the railway in surface subsidence area will be seriously damaged.

    地下开挖工程导致地表沉陷,一旦地表变形值超过一定界限时,地表沉陷区内的铁路就会受到严重破坏。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定