Single-girder bridge by a single main beam and in the end beam span both sides of the composition, dual-beam bridge consists of two main beams and side beams formed.
单主梁桥架由单根主梁和位于跨度两边的端梁组成,双梁桥架由两根主梁和端梁组成。
The bridge is set to span across the Gui River as a way to improve the overall transportation of the 2022 Winter Olympics which will be held between two big cities.
这座桥将横跨整个妫河,作为改善2022年冬奥会整体交通的一种方式。冬奥会将在两个大城市之间举行。
Using a spatial composite finite element method, combining three-dimensional solid element and bar element, the mechanical analysis of a two-span curved PC continuous box girder bridge is conducted.
采用三维实体单元和杆单元相结合的空间组合有限元方法,对一座两跨曲线预应力混凝土箱形连续梁桥进行空间受力分析。
The main bridge of Sanmenjiang Bridge in Liuzhou is a 3-span partial cable-stayed prestressed concrete box beam bridge with two pylons and double cable planes.
柳州三门江大桥主桥为双塔、双索面、三跨部分斜拉预应力混凝土箱梁桥。
In this structure, the natural bridge support bar in the middle of two free pile after a wide span can be achieved.
在这种结构中,天然支架桥在两个自由杆的中间加桩后可达到很宽的跨度。
The Golden Gate Bridge had the longest (2) span in the world, at the time it was built. The suspended roadway stretches one thousand two hundred eighty meters between the bridge's two tall towers.
金门大桥建成之时是当时世界上最长的悬索桥,两个桥塔之间的悬空车道绵延1280米。
The article proposes to clear away the earth and stones covering the two springs of arch of the bridge and then survey and determine with accuracy its clear span.
该文建议挖开掩盖赵州桥拱脚的石块和泥土,找到两拱脚,精确测定净跨径。
The main bridge of Dalian Quanshui No. 4 Bridge is a box-section prestressed steel concrete two-hinged flat arch bridge with 88m span and 1/12 rise-to-span ratio.
大连市泉水居住区四号路跨东北路桥主桥是跨度为88米,矢跨比1/12的箱形截面预应力钢筋混凝土双铰坦拱。
The main bridge of Dalian Quanshui No. 4 Bridge is a box-section prestressed steel concrete two-hinged flat arch bridge with 88m span and 1/12 rise-to-span ratio.
大连市泉水居住区四号路跨东北路桥主桥是跨度为88米,矢跨比1/12的箱形截面预应力钢筋混凝土双铰坦拱。
应用推荐