• This paper introduces the transform of belt conveyor turning part, setting up adjustment principle and ways.

    介绍带式输送机转弯段的改造、安装调试原理和方法。

    youdao

  • Geological landslides and technical over-break in turning part shall be measured again and converted to total length of the tunnel.

    地质塌方、转弯段的技术性超挖按实计量并折算成隧道延米计价。

    youdao

  • Geological landslides and technical over-break in turning part shall be measured again and converted to total length of the tunnel.

    地质塌方、转弯段的技术性超挖按实计量并折算成隧道延米计价。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定