• Partial rigid restraint like top slab and column will increase the wall's stress.

    局部刚性约束如顶板、柱子等将增大墙体的应力。

    youdao

  • Basically, a composite concrete deck consists of a concrete top slab, flanked on each side by concrete main beams, and a concrete middle beam.

    组合混凝土梁的基本构成是顶部为混凝土平面,两侧为混凝土主梁,中间为混凝土中梁。

    youdao

  • The top of the lower slab is covered in decking to form a terrace and glass balustrades surround the rectangular voids.

    底板的顶部覆盖了装饰物,形成了一个平台,玻璃栏杆环绕在矩形空隙周围。

    youdao

  • He had noticed, at the top of the Pyramid of the Inscriptions, a stone slab with holes in it.

    他注意到在铭文金字塔顶部有一块带孔的石板。

    youdao

  • This paper researches the plane stiffness of new composite structure for slab on the lower flange, which is compared with the traditional structure for the slab on the top flange.

    本文研究了将楼板置于钢梁下翼缘的新型组合结构平面刚度,并和传统的将楼板置于钢梁上翼缘的结构形式的平面刚度和极限承载力作了比较。

    youdao

  • The cracks often appear on the top of concrete floor slab.

    现浇钢筋混凝土楼板面易产生裂缝。

    youdao

  • This paper presents bridging slab and asphalt overlay method that is to widen the top of joint and crack and then fill with new concrete and overlaying with asphalt concrete.

    提出将旧板接裂缝顶部拓宽再采用水泥混凝土搭板来处理接裂缝,然后进行沥青罩面的方法,称为搭板罩面法。

    youdao

  • Concrete was poured in separately from mid-span of arch slab to the supports and then from the supports to the top chord of the arch chord so as to balance the pouring load.

    分两组由拱板下弦跨中同时向拱板支座浇筑混凝土,然后从拱板支座连续沿拱板上弦向中间合龙,使浇筑荷载相对均衡。

    youdao

  • In order to let the slabs help the top chords of the steel trusses resist the giant compressive forces, slab truss composite structures are used throughout the main bridge.

    为了使上层公路桥面板能帮助主桁上弦杆抵抗巨大的纵向压力,正桥全部采用混凝土桥面板与钢桁梁共同作用的板桁结合梁。

    youdao

  • The slab has provided greater fixity to the top flange , and the adjacent web gap has experienced greater deformation and has cracked first .

    桥石板为上翼缘提供了很大的固结度,于是相邻的腹板间隙就经受了较大的变形并且首先开裂。

    youdao

  • The slab has provided greater fixity to the top flange, and the adjacent web gap has experienced greater deformation and has cracked first.

    桥石板为上翼缘提供了很大的固结度,于是相邻的腹板间隙就经受了较大的变形并且首先开裂。

    youdao

  • The slab has provided greater fixity to the top flange, and the adjacent web gap has experienced greater deformation and has cracked first.

    桥石板为上翼缘提供了很大的固结度,于是相邻的腹板间隙就经受了较大的变形并且首先开裂。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定