The Transformer stage needs to extract time information from an input string containing timestamp data in order to correctly populate the TIMECHANGED column in the target DWADMIN.ACCT table.
Transformer阶段需要从包含时间戳数据的输入字符串提取时间信息,以准确地填充目标DWADMIN.ACCT 表中的 TIMECHANGED列。
Both of these limitations stem from the same problem: a Transformer must reprocess the XSL every time it executes a transformation.
这两个限制源自同一问题:Transformer每次执行转换时,都必须重新处理XSL。
The Web service pack will add two real-time stages to DataStage: Web services client stage and Web services transformer stage.
Webservice包将添加两个实时stage到 DataStage 中:Web服务客户机 stage和 Web 服务转换器 stage。
Syntax takes the syntax elements and combines them back together, following the same rules as the transformer in syntax-rules. Let's look at what's happening one step at a time.
syntax可以使用这些语法元素,并将其组合在一起,它遵循与syntax -rules中相同的转换规则。
The Transformer object processes the XSL stylesheet each and every time transform is executed.
每次执行transform ,Transformer对象都要处理xsl样式表。
Which I designed the equipment transformer factory planning ranked first in class and I spent most of the time and half of the students.
其中我设计的变压器厂的设备规划在班上排名第一而我花费的时间还是大部分同学的一半。
On basis of LR circuit transition process analysis, the paper describes measuring method of zero time factor for transformer wire-wound resistor with specific exciting supply.
本文在分析LR电路过渡过程的基础上,讨论了以特定激励源实现变压器绕组电阻零时间常数测量的方法。
The judgment of transformer insulation condition, which is based on preventive test and DGA, has played an important role of accident prevention for a long time.
长期以来,根据预防性试验和油中溶解气体的气相色谱分析结果判断变压器的绝缘状况,对防止事故的发生起到了很大作用。
The variable off-time regulates how often the transformer charges and delivers power to the load.
可变的间隙时间调节转换器多久充电和传递能量到负载。
Through consideration to the stacking at the time of transport and structural features of transformer top, the dimension and structure of bumper pad on top was designed by similar method.
考虑运输时堆码及变压器顶部结构特点,采用相似设计方法设计了顶部缓冲衬垫的尺寸及结构。
NEON STONE is resin-type neon transformer in compliance with EN61050 which unique structure provides extended life-time and stable running even after its warranty period.
NEONSTONE是涂树脂于变压器,以EN61050为例,独特的结构可以使它连续稳定的工作并可以有效的延长它的使用寿命。
At the same time, the restraint of actual switching times of the capacitor and transformer is considered.
算法应用过程中考虑了变压器和电容器的实际操作次数约束。
Because leakage inductance value of rectiformer used in DC EAF is larger than common power transformer, the rectifier has longer commutation time.
直流电弧炉用整流变压器漏抗值设计较一般电力变压器大,整流器换相时间延长。
The winding loss model of central-tapped transformer in SMPS is different from that of the non-tapped transformer because the two secondary windings work in different time intervals.
中间抽头变压器由于两个副边线圈是分时工作,其线圈损耗模型不同于无抽头原副边线圈同时工作的变压器。
This paper analysis reason of bring gas of C2H2 on the purifying process of transformer oil time and time, then brings some methods to treatment.
针对变压器油净化处理过程中多次产生乙炔(C2H2),分析原因并提出相应的防范措施。
It emphasized the GPS information format, approach to picking up the time information, and also the principle and implementation for Angle orientation using rotating transformer.
重点叙述了GPS信息格式和筛取时间信息的方法以及使用旋转变压器作角度定位的原理和实现方法。
Considering the requirement of data transmission reliability and real time in distribution transformers, a monitoring system of distribution transformer in real time based on GPRS was introduced.
针对配变监测系统对数据传输可靠性和实时性的要求,本文介绍了一种基于移动GPRS无线通信方式的配电变压器电力参数实时监测系统的设计方案。
Firstly, this paper shows a method to detective the open circuit loss and the load loss of the there-phase power transformer online by operating the real-time voltage and current of the transformer.
首先,本文对三相电力变压器空载损耗、负载损耗在线检测理论进行了讨论和分析。
Large power transformer and high voltage reactor are important equipments in power system, so the correct and in-time diagnosis of their faults and operation maintenance are very important.
大型电力变压器和高压电抗器是输变电系统的重要设备,对其故障进行及时和正确的诊断,并给予检修,关系到整个电网的安全运行,十分重要。
At the same time, probability reasoning can be realized by BN, which can be used to describe changes of fault symptoms and analyze fault reasons of transformer.
同时利用贝叶斯网络实现概率推理,便于描述故障特征的变化及对变压器故障原因的快速分析。
The design method of the high voltage and the fast response time pulse transformer used in the condition of low load impedance was introduced.
介绍了工作于低阻抗负载下的高压大电流快响应脉冲变压器的一种设计方法。
This transformer has burnt out. It should have been replaced a long time ago.
变压器已经烧毁了,早该拆换一个新的了。
The real time controlling scheme of compensating capacitors and tap joint of transformer is established, the systematic block diagram is provided, and the hardware based on this method is realized.
建立了补偿电容器和变压器分接头的实时控制解决方案,给出了系统框图,并从硬件上实现了该方法。
Using this method, the gas in oil concentrations at any future time can be predicted, hence the insulation of oil filled transformer can be also diagnosed.
这一方法可以预测将来任一时刻的油中气体浓度,从而诊断变压器的绝缘状况。
The general inverse time characteristic is introduced, and the setting principles of current and time when inverse time characteristic is scarce or voltage transformer breaks are provided.
介绍了普通反时限特性,并提供了缺乏反时限特性段或电压互感器断线时的电流、时间整定原则。
Load-time transformation is incremental: The transformer processes individual classes one at a time as they are loaded.
载荷-时间转型是增量:变压器过程中的个别班级一个在一个时间,因为他们已经上膛。
Likewise, generating units or transformer Banks and transmission lines can be lightly or heavily loaded at a particular time and can be varied in many cases by local control.
同样,发电机组、变压器组以及输电线路在特定时候可以轻载或重载,在很多情况下可通过就地控制而改变。
It solves the on-site verification voltage transformer work intensity, operation cumbersome problem, at the same time the product performance is reliable, powerful.
它解决了现场检定电压互感器工作强度大、操作繁琐问题,同时该产品性能可靠、功能强大。
It solves the on-site verification voltage transformer work intensity, operation cumbersome problem, at the same time the product performance is reliable, powerful.
它解决了现场检定电压互感器工作强度大、操作繁琐问题,同时该产品性能可靠、功能强大。
应用推荐