In this paper, the mechanical conditions of anchors in the excavated slope at the TGP double-line five-grade ship locks are analyzed.
本文对三峡双线五级船闸边坡的锚杆锚固受力状态进行了分析。
The full process testing curves of stress strain for the granite of the TGP permanent lock present typical elastic brittle plastic properties.
长江三峡花岗岩测试表明,其应力应变全过程曲线呈现典型的弹脆塑性。
The second stage foundation pit of the TGP will be bounded by the upstream and downstream transverse cofferdams and the longitudinal concrete cofferdam.
三峡工程二期上下游横向围堰与混凝土纵向围堰共同形成基坑,保证二期工程施工。
On the basis of the above-mentioned studies, a prediction is made on the future tendency of the TGP reservoir-induced earthquakes when the reservoir water level further rises.
在此基础上,对三峡工程水库随着库水位抬升诱发地震的活动趋势进行预测。
On the basis of the above-mentioned studies, a prediction is made on the future tendency of the TGP reservoir-induced earthquakes when the reservoir water level further rises.
在此基础上,对三峡工程水库随着库水位抬升诱发地震的活动趋势进行预测。
应用推荐