The train arrived at the expected time.
火车在预定时间到达。
Steveland was born earlier than the expected time and totally without sight in 1950.
史蒂夫兰得比预期出生时间早了些时候,并且在1950年眼睛完全失明。
Detect that an important shipment has not arrived at its expected destination in the expected time.
检测重要的货物没有在预期的时间达到预期的目的地。
Because of the limit, the actual transition time is longer than the expected time based on the slew rate.
由于这种限制,实际转化时间要比基于转化速率的预期时间长。
The resource manager should have full visibility into the availability of consultants during the expected time frame of the project.
资源经理必须全面了解项目的预计时间框架内咨询师的可用状况。
The name, book value, fair value, expected disposal expenses, and expected disposal costs and the expected time for disposal, etc…
准备处置的固定资产名称、账面价值、公允价值、预计处置费用和预计处置时间等。
An effective business-to-IT (B2IT) collaboration on requirements that can be achieved within the expected time and budget can help ensure success.
如果在预期的时间和预算内,可以完成有关需求的有效业务- IT (B2IT)协作,则可以帮助确保项目的成功。
“Wrap up is very important, ” Richards says. “You’ll want to ask for information about the process, what will happen next, and what the expected time frame is.
“全神贯注是最重要的,”理查兹说,“你应该将面试过程,接下来会发生什么,等待面试结果答复的时间是多长这些信息了解清楚。
This involves keeping the height of the smoke layer above the highest level of occupancy for a defined period of time, longer than the expected time to evacuate the building.
这就要求在规定的逃生时间内,保证烟气层存在于规定的逃生安全高度以上。
Writing out all the invitations by hand consumed more time than we had expected.
手写所有的邀请函花的时间比我们预计的更多。
The bill would have passed this time but for congressional maneuverings and is expected to be reintroduced and to pass next year.
这次要不是国会的周旋,该法案就会通过了。这一法案预计将于明年再次引入并获得通过。
Ordered over a week ago, the books are expected to arrive any time now.
这些书是一个多星期前订购的,现在预计随时会到。
The time he spent on OED was much longer than expected.
他花在《牛津英语词典》上的时间比预期的要长得多。
The water was cool and sweet for a man who had expected it for such a long time.
对于一个期待了这么久的人来说,这水又凉又甜。
Absolute progress. As measured by whether the phase completed within expected time frames.
绝对进度,这个阶段是否在期望的时间内完成的?
This time, the test passes as expected.
这一次,与预期的一样,测试通过了。
Latency: the expected response time of component interactions is important, because it may constrain the choice of component granularity.
延迟:组件交互的预期响应时间非常重要,因为这可能会限制组件粒度的选择。
After a selection is made from the sample, the sample makes another request (Listing 4) in a similar way, although this time the expected response is a service description document.
在从范例中作出选择之后,范例会以一种相似的方式作出另外一个请求(清单4),尽管这次预期的响应是一个服务描述文件。
In static SQL, this is not an issue, because the expected data types are known during programming time.
对于静态SQL,这不是问题,因为在编程时知道预期的数据类型。
The minister had inquired of Hester, with no little interest, the precise time at which the vessel might be expected to depart.
牧师曾经兴致勃勃地向海丝特询问了那艘船可能启航的准确时间。
ARFM continues to profile the gold traffic and increase the expected service time due to the higher actual service times it is now seeing.
ARFM分析gold请求流,由于它现在看到的实际服务时间增加了,它会提高预期服务时间。
Expected time of arrival at the port of destination, the name, telex and.
籍、船只主要规范、预计装货日、预计到达目的港时间、船公司名称、电传和电报挂号。
I am a loyal football fan and I had expected the match for a long time, so after class I hurried home.
我是一个忠实的足球迷,而且我盼望这场比赛很长时间了,所以放学后我就匆忙往家赶。
An aggressive service-invocation timer is set to the reasonable expected response time of the service, with some consideration for transient delays.
主动型服务调用计时器设置为服务合理的预期响应时间,并对传输延迟予以一定的考虑。
Business owners should write up a clear description of duties the intern will be expected to perform, desirable qualifications, the required time commitment and whom to contact.
企业主应该明确说明实习生将要从事的工作、他们需要具备的条件、需要投入的时间,以及企业的联系方式。
Maybe it's a timeline that absolutely can't be moved; at the same time, some deliverables you expected to accomplish by the deadline may now have to be jettisoned from your plan.
或许这是一个完全不能变动的时间表,同时,一些你期望在截止时间完成交付的事情可能现在不得不从你的计划中丢弃。
Maybe it's a timeline that absolutely can't be moved; at the same time, some deliverables you expected to accomplish by the deadline may now have to be jettisoned from your plan.
或许这是一个完全不能变动的时间表,同时,一些你期望在截止时间完成交付的事情可能现在不得不从你的计划中丢弃。
应用推荐