This problem was temporarily fixed by the 1603 Treasury grant Program (TGP), which provides developers with the option to receive a cash grant in lieu of the tax credits.
这个问题暂时通过“1603财政部资助项目【1603 Treasury Grant Program (TGP)】”得到了解决,它为开发商提供的选择是让其接受现金拨款以代替税收抵扣。
TGP main river channel closure has such features as large discharge, deep water and high dumping intensity.
三峡工程大江截流,流量大、水深、抛填强度高。
Therefore we conclude that TGP could protect mesangial cells against oxidative stress induced by high glucose.
因此TGP可以保护高糖诱导的肾小球系膜细胞氧化应激损伤。
It took nearly 100 years from conception, demonstration, design, construction and operation to final completion of TGP.
三峡工程从构想、论证、设计、建设至竣工全面投入运行历时近百年。
Conclusion TGP combined with low dosage methotrexate is effective and safe scheme on elderly onset rheumatoid arthritis.
结论白芍总苷联合较小剂量甲氨蝶呤治疗老年起病类风湿关节炎为有效、安全方案。
By using the sonic wave and the seismic wave, the foundation rock holding layer on-spot testing of TGP has been performed.
应用声波及地震波对三峡工程坝基建基岩体持力层进行现场检测。
Conclusions: TGP combined with LEF can delay the progression of RA and provide protection for sclerotin and synovium of joint.
结论:TGP联合lef治疗RA能稳定病情,对关节滑膜及骨质破坏起到较好的保护作用。
The Three Gorges Project(TGP) is a vitally important and backbone project in the development and harnessing of the Yangtze River.
三峡工程是开发和治理长江的关键性骨干工程。
In this paper, the mechanical conditions of anchors in the excavated slope at the TGP double-line five-grade ship locks are analyzed.
本文对三峡双线五级船闸边坡的锚杆锚固受力状态进行了分析。
The design process and the general layout of the rightbank underground power station of TGP and its construction opportunity are described.
介绍了三峡右岸地下电站设计过程、总体布置及兴建时机的研究。
This paper researches the reasons of TGP s banquette slumping during river closure by the Catastrophe theory and Self organized criticality.
从突变理论及自组织临界性理论,对三峡大江截流戗堤坍塌机理进行研究。
The full process testing curves of stress strain for the granite of the TGP permanent lock present typical elastic brittle plastic properties.
长江三峡花岗岩测试表明,其应力应变全过程曲线呈现典型的弹脆塑性。
The application of penstock blasting method for relieving the residual welding stress in TGP might provide reference for other similar projects.
三峡工程引水压力钢管应用爆炸方法消除焊缝残余应力,对其它类似工程可起借鉴作用。
This rolling construction technology of asphalt concrete core wall in Maopingxi earth and rockfill dam of TGP was the first application in China.
三峡茅坪溪防护土石坝沥青混凝土心墙骑缝碾压施工工艺为国内首创的施工方法。
Earthquake monitoring in reservoir head region of TGP started 46 years ago, which is rare in the hydraulic electricity history all over the world.
三峡工程库首区地震监测至今已有46年,在世界水电史上也是罕见的。
After completion of TGP, the flood control situation of the middle and lower Yangtze river, especially the Jingjiang reach, will be improved radically.
三峡工程建成后长江中下游特别是荆江防洪形势将会发生根本性的改善。
The second stage foundation pit of the TGP will be bounded by the upstream and downstream transverse cofferdams and the longitudinal concrete cofferdam.
三峡工程二期上下游横向围堰与混凝土纵向围堰共同形成基坑,保证二期工程施工。
Scanning electron microscope(SEM) images of TGP-H-060 carbon paper and TGP-H-060 carbon paper treated with poly tetra fluoroethylene(PTFE) were gathered.
通过扫描电子显微镜(SEM)采集了TGP-H-060型碳纤维纸和聚四氟乙烯(PTFE)处理过的TGP-H-060型碳纤维纸的平面图像。
The hydraulic hoist of tainter-gate of TGP's flood discharge deep outlet is the most important hoisting device for flood discharge and regulation of TGP.
三峡工程泄洪深孔弧形门液压启闭机是三峡工程宣泄和调控洪水最重的启闭设备。
The vibrating-hole jet grouted cut-off wall has been applied to the construction cofferdam for the power resource station at the Three Gorges project (TGP).
三峡工程电源电站施工围堰防渗采取了振孔高喷防渗墙的形式。
The safety monitoring centre, a new pattern organization, is set up to perform unified management and specialized supervision about safety monitoring of TGP.
三峡工程安全监测的管理和监理采用了组建工程安全监测中心实行统一管理、专业监理的新型模式。
Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China.
茅坪溪防护坝是三峡工程的副坝,也是目前中国最高的沥青混凝土心墙坝。
Objective: To investigate the regressive effect of total glucosides of Paeonia Lactiflora (TGP) on cardiac hypertrophy induced by L-thyroxine(L-Thy) in rats.
目的:考察芍药总甙对L-甲状腺素所致大鼠心肌肥厚的消退作用。
Methods: the transverse and longitudinal contraction role of smooth colon muscle strips at the different dosage of TGP and other medicine was separately observed.
方法:制备豚鼠结肠纵肌和横肌肌条,观察不同剂量白芍总甙及工具药对离体结肠肌收缩活性的效应。
With the completion of the Three-gorge Project (TGP), the residence time of the water body will be prolonged, and the eutrophication within TGR will be aggravated.
随着三峡工程的全面完工,库区内水体滞留时间的进一步延长,三峡库区水体富营养化趋势将会进一步加剧。
TGP aims at flood control, power generation and navigation, and the civil works and electro-mechanical works are the ma jor pillars for realization of such a target.
三峡水利枢纽工程以防洪、发电、航运为目标,土建工程和机电工程是实现这一目标的两大支柱。
Objective: to explore the effect of total glucosides of Paeony (TGP) on ex vivo colon smooth muscle of Guines pig and the release of SP and VIP in colon smooth muscle.
前言:目的:探讨白芍总甙(TGP)对离体豚鼠结肠平滑肌的作用方式及对结肠平滑肌中P物质(sp)和血管活性肠肽(VIP)释放的影响。
Conclusion TGP exerts protective effect on heart in RHR by adjusting the blood pressure and anti-oxidation effects of myocardium, and by inhibiting collagen hyperplasia.
结论该复方可能通过调节肾性高血压大鼠血压和心肌的抗氧化作用,抑制胶原增生以发挥其对心脏的保护作用。
The world-famous Three Gorges Project (TGP) is the largest hydropower station in the world and also the largest water resources and hydropower project constructed in China.
举世瞩目的三峡水利枢纽工程是世界上规模最大的水电站,也是中国有史以来建设的最大型水利水电工程。
With combination of bi-directional difference method and FEM, the computation and comparison analysis on cooling effect of flexible pipe and black pipe in TGP are carried out.
利用双向差分法和有限元法相结合,对三峡大坝采用软冷却水管和黑铁管的冷却效果进行了计算与对比分析。
应用推荐