While the project managers coordinate on configurations and iterations, the ClearQuest administrator works with the test leads to determine the requirements for storing test scripts.
当项目管理者调整配置和迭代的时候,ClearQuest管理员正在同测试领导者一起决定存储测试脚本的需求。
Meanwhile, as the configurations, iterations, and file locations are being finalized, the test leads begin to put their test plans for the upcoming release into ClearQuest test management.
与此同时,随着配置、迭代和文件位置被最终确定下来,测试领导者开始将他们即将发布的计划放到ClearQuest测试管理之中。
Measurements made using the micro-ohmmeter are always performed using the four-wire technique in order to minimize errors caused by test leads and connections.
使用微欧计进行电阻测量必须采取四线技术以使测试电缆和连接器带来的误差减至最小。
Attach test leads to pins 1 and 2 and note ohmmeter reading.
把测试探针连接到插头1和2,并记下欧姆表读数。
Attach test leads to pins 5 and 6 and note ohmmeter reading.
把测试探针连接到插头5和6,并记下欧姆表读数。
But many cancer specialists say that if the test leads to more screening, that is not necessarily a good thing.
但很多癌症专家称如果这项测试导致更多的检查,它不见得就是件好事。
Shielding the test leads and the DUT (Figure 3-6) will often reduce interference effects to an acceptable level.
对测试引线和DUT进行屏蔽(图3 - 6)常常能够将这种干扰的影响降低到可以接受的水平。
The meter then measures the voltage across the resistance through the same set of test leads and computes the resistance value accordingly.
然后仪表通过同一套测试引线来测量电阻两端的电压,并计算出相应的电阻数值。
This is especially important when higher currents are used because the voltage drop across the test leads may be large compared to the voltage drop across the contact.
在使用较大的电流时,这一点特别重要。因为和接点两端的电压降相比,测试引线两端的电压降可能会比较大。
This is especially important when higher currents are used because the voltage drop across the test leads may be large compared to the voltage drop across the contact.
在使用较大的电流时,这一点特别重要。因为和接点两端的电压降相比,测试引线两端的电压降可能会比较大。
应用推荐