• Project tendering process and best practices will be reviewed.

    项目招标过程和好的实践经验将被讨论。

    youdao

  • Chinese tendering process for steam turbines and turbo generator.

    了解中国汽轮发电机组市场投标过程。

    youdao

  • The company nevertheless submitted a bid in a tendering process which it now argues is illegal.

    不过阿尔斯通自己也是竞标进程中的一员,现如今它称这项招标是非法的。

    youdao

  • For this reason, there was a separate tendering process for each individual building site.

    因为这个原因,有一个单独的投标过程为每个建筑的场地。

    youdao

  • Participate in subcontract Bidding and tendering process of construction steel structure ;

    参与工程项目建设的钢结构分包的招投标;

    youdao

  • The results of this study in the tendering process to reduce the loss have a certain significance for the owners.

    本研究结果对业主在招标过程中减少业主损失有一定的指导意义。

    youdao

  • It was a complex start to the project, right from organising the tendering process, to hiring the right contractors to do the building.

    作为这个项目的开端- - -招标就是一个非常复杂的过程,我们需要雇用一个合适的承包商。

    youdao

  • The bidder has other unlawful practices or does not follow other relevant provisions in the tendering document in the tendering process.

    在招标过程中有其他违规行为或未遵守本招标文件的其它有关规定的。

    youdao

  • Concerns were initially raised by the World Bank, which was funding a tendering process to choose a supplier for school materials in Southern Sudan.

    该问题最初是由世界银行提出的。他们提出投标为南苏丹选择学习资料供应商。

    youdao

  • Article 24. As the producer of the architectural product, the construction enterprise shall be entitled to the following rights during the bidding and tendering process.

    第二十四条施工企业作为建筑产品的生产者,在施工招标投标的活动中,享有下列权利。

    youdao

  • Participate in the entire cycle of project tendering, contracting and monitoring process of activities included in the Overall Work Plan and successive Annual Work Plans.

    参与项目全面工作计划和年度工作计划中包含的招投标、合同签订与活动执行情况监督的整个过程。

    youdao

  • The analytical hierarchy process (AHP) is in combination with the theory of multi_objective fuzzy optimization to set up a model of tendering assessment of hydraulic projects.

    将层次分析法(AHP)和多目标模糊优选理论相结合,建立水利工程评标模型。

    youdao

  • The analytical hierarchy process (AHP) is in combination with the theory of multi_objective fuzzy optimization to set up a model of tendering assessment of hydraulic projects.

    将层次分析法(AHP)和多目标模糊优选理论相结合,建立水利工程评标模型。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定