Experimental results showed this approach could reduce task time greatly and had a good effect in actual application.
实验结果表明该方法能够大幅度降低货物的出入库时间,在实际应用中获得了良好效果。
The task editor now includes a new Time Tracking section that displays a graph of time spent on the task. Time spent can be adjusted by the developer as needed to reflect the accurate information.
现在的任务编辑器具有一个全新的时间跟踪部件,它可以图形化的方式展示出花在该任务上的时间,开发者可以根据需要调整时间以反映出最真实的情况。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
应用推荐