The services generally cost $10 a month, but some of Sprint’s all-inclusive plans offer this feature as a free add-on, and iPhone owners can pay $70 a year for AT&T Navigator.
这项服务一般每月收取10美元,但Sprint提供的某些全包服务将其作为免费附加项目,而iPhone用户可以一年支付70美元购买AT&T的价格搜索服务。
For example, the enterprise could establish a T-3 or OC-3 connection forth cost of several T-1 links and distribute incremental bandwidth throughout the organization.
例如,企业能以几条t - 1链路的代价建立一条t - 3或oc - 3链接,把增加的带宽在整个机构内进行分配。
Based on T-S fuzzy model, the guaranteed cost control problem of a class of uncertain nonlinear systems with input and state time delay is discussed.
针对一类具有输入与状态时滞的参数不确定非线性系统,基于T - S模糊模型,讨论该系统的保性能控制问题。
Based on logistics activity-based costing, the paper adds logistics time to logistics cost calculation and built the T-A model of logistics costing.
在物流作业成本法的基础上,加进了基于物流时间的物流成本核算方法,构建了物流成本核算的T - A模型。
Based on T-S fuzzy model, a fuzzy output feedback guaranteed cost control problem is studied for a class of uncertain discrete-time systems with multiple time delays.
针对一类用t - S模糊模型描述的多时滞离散不确定系统,研究了其输出反馈保性能鲁棒控制问题。
The problem of the reliable guaranteed cost control for a class of T-S fuzzy time-delay systems containing actuator failures is studied in this paper.
研究了含有执行器故障的T - S模糊时滞系统的可靠保性能控制问题。
The technique first welding together then bending for t sections can save a lot of material and labor cost, and has outstanding advantages.
T型材的先焊后弯工艺可以节约大量的材料和劳动力成本,具有明显的优势。
The use of wide area T&D systems to interconnect a large number of generators and loads provides tremendous benefits in the cost and reliability of electricity supply.
大电网与分布式电源相结合的方式,在提高供电可靠性、减小系统旋转储备和有效利用能源等方面都颇具优势。
Based on t s fuzzy model, the fuzzy guaranteed cost control problem is studied for a class of uncertain systems with time delay.
研究一类用t -S模糊模型描述的不确定时滞系统的鲁棒保成本控制问题。
Sure, that theory had been around since Henry produced the Model t, but somewhere along the road the cost of manufacturing, and therefore owning, a car had skyrocketed.
当然,这一理论已被周围的自亨利生产示范吨,但某处公路沿线制造成本,因此拥有,一辆汽车已暴涨。
Optimizing a prestressed concrete T-frame beam, selecting reasonable effective height of section and prestressed steel area can improve the beam's performance and reduce the cost.
对预应力混凝土T梁进行优化设计,选取合理的截面有效高度及预应力筋截面面积,可以提高梁的承载能力,降低工程造价。
The US shouldn"t rely on stimulus alone to prop up the economy. It should develop a comprehensive plan to rein in healthcare cost to 12% of GDP or lower."
美国不能只依靠刺激来振兴经济,必须提出全面的计划控制保健费用到GDP的12%或更低。
Ultimately, based on the analysis of the principle of the theory of constraints (TOC), the author brings forward a TOC-based cost management pattern t…
最后,在分析制约理论核心原理的基础上,提出了一种基于制约理论的成本管理模式,试图为研究适应现代企业的成本管理模式提供新的思路。
This automatic welding system is suitable for the automatic welding of the T-shape seam and good results have been achieved. It is a low-cost-automatic welding system for T-shaped seam.
该自动焊接系统在钢制散热器管道焊接生产应用中取得了良好的效果,是一种低成本自动化的T形管焊缝专用焊接设备。
We can get a simple and utility process technology of slot in thin shell accessory, which is more efficient and low cost. T…
选用加工成本更低,生产效率更高的钻铣机床,获得一种操作简单实用、生产效率高、加工成本低的薄壳类零件槽孔加工工艺。
We can get a simple and utility process technology of slot in thin shell accessory, which is more efficient and low cost. T…
选用加工成本更低,生产效率更高的钻铣机床,获得一种操作简单实用、生产效率高、加工成本低的薄壳类零件槽孔加工工艺。
应用推荐