If wind power can be accurately forecast in advance, scheduling plan can be adjusted timely to ensure power quality, reduce system reserve capacity and acquire more economic and social benefits.
如果能够提前对风电功率进行准确的预测,则有利于及时调整调度计划,保证电能质量,减少系统备用容量,获得更多的经济效益和社会效益。
The security cost consists of the system reserve cost, the rescheduling cost and the expected system instability cost.
安全成本由备用成本、再调度成本和期望失稳损失组成。
Access control system: Reserve enough space for installing the access control system, underground garage and public area will install access control system.
门禁系统:每栋建筑内预留门禁系统穿线空间,地下车库及公共部分设立门禁系统。
Access control system: Reserve enough space for installing the access control system, underground garage and public area will install access control system.
门禁系统:每栋建筑内预留门禁系统穿线空间,地下车库及公共部分设立门禁系统。
应用推荐