• Dad doesn't like heights, so he stayed at the bottom of the tower and took pictures from the ground.

    爸爸喜欢高处所以底部地面拍照

    youdao

  • I stayed in student dorms in Swedish university towns and plush colonial-era houses in Madrid via communist-built tower blocks on the outskirts of Wroclaw in Poland.

    曾经住瑞典大学城学生宿舍里,马德里一间殖民时期房子里的一张豪华沙发,以及波兰罗茨瓦夫郊外的一幢公共高层住宅。

    youdao

  • It is believed that the crossing will form the world's longest single-tower, asymmetric cable-stayed bridge.

    据说,它成为世界最长单塔不对称斜拉桥。

    youdao

  • Being asymmetric, it's more complex to determine the reasonable finished state and the reasonable construction state of the asymmetric cable-stayed bridge with single tower.

    对称斜拉桥由于对称性,使得合理成桥状态合理施工状态确定显得更为复杂

    youdao

  • Binzhou Yellow River bridge, which is a three-tower prestressed concrete cable-stayed bridge, applies the C55 concrete in the towers.

    滨州黄河大桥主桥预应力混凝土斜拉桥,桥塔采用C55高性能混凝土。

    youdao

  • Anchorage zone of pylon, which is a key part of cable-stayed bridge, can pass local concentrated cable force to the tower column safely and uniformly.

    塔·拉索锚固斜拉桥中的关键部位,其作用是局部集中安全,均匀地传递塔柱。

    youdao

  • The static characteristics of the single pylon cable-stayed include the internal force and deformation of main girder, reaction force, force and deformation of the main tower.

    塔混凝土斜拉桥静力特性主要包括主梁受力变形支座反塔受力及变形、拉索受力。

    youdao

  • Binzhou Yellow River bridge is a three-tower cable-stayed bridge with prestressed concrete girders.

    滨州黄河大桥主桥三塔预应力混凝土斜拉桥,主梁为预应力混凝土箱梁。

    youdao

  • The buffeting performance of the free-standing tower of Zhanjiang Bay Bridge, a long-span cable- stayed bridge, under yaw wind is investigated by means of wind tunnel test of aeroelastic full model.

    通过气弹模型试验作用湛江海湾大桥抖振响应性能进行了研究

    youdao

  • In construction of cable tower of cable-stayed bridge, whole vertical-rotation lifting method can reduce difficulty in assembly of cable tower structure at high altitude.

    采用整体竖转施工方法进行斜拉索桥倾斜的吊装,降低索塔结构高空拼装工作难度

    youdao

  • Abstract: Shanghai MinPu two bridge for single tower and double cable plane steel truss cable-stayed bridge of the composite beams.

    摘要上海闵浦双索面钢板组合梁斜拉桥

    youdao

  • Finally, the calculation of the effective length of the tower and main girder for a certain steel cable-stayed bridge is illustrated.

    本文例举斜拉桥塔柱主梁自由长度及其稳定性的计算

    youdao

  • The Changxing harbor bridge in Zhejiang is a prestressed cable-stayed bridge with two tower and single-cable-plane.

    浙江长兴大桥座双塔单索面预应力混凝土矮塔斜拉桥

    youdao

  • Xiamen Yinhu bridge is a partially cable-stayed prestressed concrete bridge, whose pier, tower and beam are consolidated together.

    厦门同安银湖大桥国内第一座使用环氧全涂平行钢绞线斜拉索的预应力混凝土部分斜拉桥,固结体系。

    youdao

  • In this paper, an example of Shawan Bridge static load experiment has been shown to introduce a general way of Short Tower Cable-stayed Bridge static load experiment.

    本文沙湾特大介绍斜拉桥试验一般方法

    youdao

  • There are few RC single-tower cable-stayed bridges with connected tower and separated decks in internal and international bridge engineering.

    混凝土斜拉桥采用联塔幅的结构型式在国内外均属少见。

    youdao

  • We stayed in a dozen-story building according to the plan. It was a representative office of China Technology Importation Company, with a balcony facing the Eiffel Tower.

    我们按住进了栋十几层高公寓,中技公司驻法代表处阳台上可以看到埃夫尔铁塔。

    youdao

  • Nanjing Third Yangzi River Bridge is the first cable-stayed bridge in China of which the main tower is in the form of steel structure.

    南京长江第三大桥我国第一采用结构形式斜拉桥

    youdao

  • Climbing-frame is often used in the high-tower construction of cable-stayed or cable-suspended bridge, but seldom used in common pier construction.

    爬架施工一般应用斜拉桥悬索桥高塔塔柱施工很少用于一般墩身施工。

    youdao

  • Stemmed from Japan, for medium length spans (those between 100 meters and 200 meters), low tower cable-stayed bridge is fast becoming the bridge of choice.

    斜拉桥于梁斜拉桥之间种桥型适用跨度介于梁式桥和斜拉桥之间。

    youdao

  • It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.

    首次使用移动模建设共和斜拉桥主梁一个单一住宿表面单塔斜拉桥的

    youdao

  • It is the first time for movable scaffolding equipment to be used in the construction of main girder of Gonghe cable-stayed bridge which is a single stay surface, single tower cable-stayed bridge.

    首次使用移动模建设共和斜拉桥主梁一个单一住宿表面单塔斜拉桥的

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定