The rest of the article examines several versioning techniques for supporting old and new interfaces concurrently (stage 3) and an approach for decommissioning the existing interface (stage 4).
本文的剩下部分将研究一些用于同时支持旧接口和新接口的版本控制技术(第3阶段)和一种用于使现有接口退役的方法(第4阶段)。
From the construction of an asset to its final decommissioning, Hydratight provides joint integrity solutions at every stage of the lifecycle of an oil and gas facility.
从资产建造到最终停运,海卓泰特在石油天然气设备生命周期的各个阶段都能提供连接完整性解决方案。
From the construction of an asset to its final decommissioning, Hydratight provides joint integrity solutions at every stage of the lifecycle of an oil and gas facility.
从资产建造到最终停运,海卓泰特在石油天然气设备生命周期的各个阶段都能提供连接完整性解决方案。
应用推荐