• I In Shanghai downtown area, Shanghai Line 4 will get through the existing Shanghai Stadium Station of Metro Line 1 to achieve the "T" interchange.

    提要:在上海闹市区,地铁4 号线线路将穿越已建地铁1 号线上体馆车站,以实现两线站台T 型换乘。

    youdao

  • The project of Chengdu Metro Stadium Station has high standards of waterproof engineering, because of its deep base, rich groundwater and big technical difficulties.

    成都地铁体育馆站工程,基础埋深大,地下水丰富,技术难度大,对防水要求标准高。

    youdao

  • The project of Chengdu Metro Stadium Station has high standards of waterproof engineering, because of its deep base, rich groundwater and big technical difficulties.

    成都地铁体育馆站工程,基础埋深大,地下水丰富,技术难度大,对防水要求标准高。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定