The user is able to complete, force complete, or skip the source activity.
用户可以完成、强制完成或跳过源活动。
Figure 15 shows the menu offering the options how the source activity should be handled.
图15显示的菜单提供了应如何处理源活动的选项。
When the source activity finishes running, the target activity at the other end of the link runs.
当源活动结束运行时,链接另一端的目标活动便开始运行。
The possible states of the source activity to perform a jump are: claimed, ready, running, stopped, and waiting.
可以执行跳转的源活动的可能状态包括:已请求、就绪、正在运行、已停止和正在等待。
Important: To jump between two activities, it is not required that the target activity is a successor of the source activity.
重要说明:要在两个活动之间跳转,不要求目标活动是源活动的后续活动。
You can create links from a single source activity to multiple target activities or multiple source activities to a single target activity.
您可以创建从单个源活动指向多个目标活动的链接或从多个源活动指向单个目标活动的链接。
A jump semantically consists of two steps: first, the source activity of the step is ended and second, the target activity of the jump is executed.
跳转在语义上分为两个步骤:首先,该步骤的源活动结束,其次,跳转的目标活动执行。
The only thing that you cannot do is to create a cycle, meaning the source activity links to the target activity which links back to the source (similar to an endless loop).
您唯一不能做的是创建循环,即将源活动链接到目标活动,而目标活动又链接回源活动(类似于无限循环)。
The only thing that you cannot do is to create a cycle, meaning the source activity links to the target activity which links back to the source (similar to an endless loop).
您唯一不能做的是创建循环,即将源活动链接到目标活动,而目标活动又链接回源活动(类似于无限循环)。
应用推荐