• When there are no particular requirements on the Drawings, water flow behind the lining shall all be drained into the inner side ditch of the tunnel.

    如图纸无特殊要求,衬砌背后之流水应排入隧道内侧排水沟或中央排水管内。

    youdao

  • The existing highway design criterion only takes setting pavement longitudinal grade, side ditch and drainage ditch into account in order to eliminate surface water.

    现有的公路设计中,考虑较多的仅仅是通过设置道路的纵坡、边沟及排水沟等设施来排除地表水。

    youdao

  • The existing highway design criterion only takes setting pavement longitudinal grade, side ditch and drainage ditch into account in order to eliminate surface water.

    现有的公路设计中,考虑较多的仅仅是通过设置道路的纵坡、边沟及排水沟等设施来排除地表水。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定