• Development should be finished in 48 hours after coating, if there is ample humidity in work shop, it must be finished within 12 hours.

    涂覆后需在48小时内曝光显影,若操作场所湿度较大,需在12小时内完成。

    youdao

  • IR98 is a 100% silicone aluminum coating with high temperature resistance. Applied on prepared steel or zinc silicate shop primer.

    硅酮铝涂料,耐高温,可以涂布于处理过的钢或无机硅酸锌漆表面。

    youdao

  • We have around 500 employees, and 30,000 square meters of manufacturing space divided into wood shop, spray paint line, metal shop, powder coating line, acrylic shop, assembly areas and warehouse.

    拥有员工约500多名,占地3万平方米,生产车间分为木器车间、喷漆生产线、喷粉生产线,亚克力车间、包装区和五金车间共六大车间。

    youdao

  • We have around 500 employees, and 30,000 square meters of manufacturing space divided into wood shop, spray paint line, metal shop, powder coating line, acrylic shop, assembly areas and warehouse.

    拥有员工约500多名,占地3万平方米,生产车间分为木器车间、喷漆生产线、喷粉生产线,亚克力车间、包装区和五金车间共六大车间。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定