The lorry 's load had been securely strapped down .
卡车上的货物已捆扎牢固了。
With the help of sample scenarios, the article demonstrates how DB2's LOAD FROM CURSOR feature can be used to copy data fast and simple within a database and also between different databases.
本文通过示例场景演示了如何使用DB2的LOADFROM CURSOR特性在一个数据库中以及不同的数据库之间快速轻松地复制数据。
GRUB 2's modular nature means that you can explicitly load modules to support various features.
GRUB2的模块化性质意味着您可以显式加载模块支持各种特性。
Load testing to the point of breaking the server(s) lets you know the performance envelope of you systems.
将负载加到最大,直到服务器运行中止,这样做可以发现系统的性能极限。
To fill this niche, the CAMCOPTER S-100 now can carry up to 80 kg (176 lbs) of external under-slung load.
为了满足需求,CAMCOPTER S-100无人机现在可以采用外部副吊挂携带80公斤(176磅)货物。
Once I’ve selected the best image(s) I’ll load the RAW files into Lightroom for initial processing.
在选出最好的照片之后,我会把RAW文件载入Lightroom做最初的处理。
Use a wire sling of a greater S. W. L whenever the exact weight of the load is unknown or there is a hazard to personnel.
当无法确定载荷的准确重量或对人员存在危险时,使用大于安全工作负荷的钢丝绳。
Although there is little effect to limited capacity by circumstance of load test, yet is not ignore effect to the P-S curve of single pile.
单桩静载荷试验的试验环境虽然对极限承载力影响较小,但是对试桩的荷载位移曲线的影响是不可忽视的。
The test program will operate the permanent magnet propulsion motor up to full power (full torque and full load) in a test facility that simulates an actual U. S. Navy DDG-1000 engine room.
测试程序将在一个美海军仿真实际DDG-1000引擎室的测试设施中操作永磁推进马达至全功率(全扭矩和全负载)。
It took 4 of us to load it in my van at Local 7's school.
它采取了4条,我们的负载,它在我的车在当地7月的学校。
Single stiffness is presented through Q-S curve, and the load of the top of pile is computed by circulating many times, so it can avoid man-made rectification.
通过单桩的荷载沉降曲线确定群桩中单桩的刚度,并可用逐次逼近的方法求解桩顶反力和基础沉降,避免了对刚度的非理性调整。
A chance constrained programming model is built to the stochastic optimal power flow problem (S-OPF) considering load probabilistic distributions.
针对考虑负荷概率分布的随机最优潮流问题,建立了相应的机会约束规划模型。
The current loss in magnetically insulated transmission line (MITL) on pulsed power installation "S-300" is studied by measuring bremsstrahlung between the electrodes, current and voltage in the load.
在装置“S- 300”上,通过测量真空磁绝缘传输线中电极间电子流轫致辐射和负载上的电流、电压等参数,研究了磁绝缘传输线中的电流损失特性。
The structural load effect S and the resisting force R are obtained through analyzing the force condition of gravity dam.
通过对重力坝的受力分析,得到结构的荷载效应S及结构的抗力R。
In this paper, the application of ACS800'S DTC inverter in load distribution of 3400/250 three wire multi-cylinder paper machine is introduced.
介绍了ACS800直接转矩控制变频器在3400/250三叠网多缸纸机负荷分配中的应用,就通讯、联锁、参数设置及使用中的注意事项等问题进行了讨论。
This paper presents the construction and drive system designs and operating load torque calculation for a caterpillar trailer fixed on table with VVVF s drive system.
介绍了新型台式变频履带牵引机的结构设计、工作负载转矩计算及拖动系统设计。
The creep test results on hard structural plane in TGP s permanent lock regions are represented, and the creep status of structural plane under the acting of a constant load are emphatically analysed.
介绍了三峡工程船闸区硬性结构面的蠕变试验结果,着重分析了结构面在恒定荷载作用下的蠕变性态。
In order to improve load scalability, some applications employ a different type of MT architecture: they create one or more thread (s) per task rather than one thread per connection.
为了提高负载能力,产生了一些不同类型的MT架构:创建多组线程,每组线程服务一个任务,而不是一个线程服务一个连接。
The brake beam(connecting plate) is often broken, and the bolts for fixing the connecting plate are loosed due to the crane′s dynamic load when D series of crane beams are working in a steel plant.
某钢厂列吊车梁在工作中,由于吊车工作的动态作用,导致制动梁(连接板)经常发生断裂,固定连接板的螺栓松动。
In this paper, the grey theory is used to predict both ts curves obtained from the fast load test and general P-S curve.
运用灰色系统理论,对地基现场快速载荷试验各荷载下的t -s曲线及总体的P - s曲线进行了双重灰色预测。
The square of the r. m. s . load voltage represents the power dissipated in a purely.
负载电压的平方值表明了功率消耗为阻性负载的持续温度。
The economic and reliability benefits of storage-plant when satisfying load' s steep increase are called ramping duty benefits.
蓄能电站在应付负荷急剧爬升阶段所体现出的经济性和可靠性效益称为爬坡效益。
P. S. :The peak current or power should be tested when other output of DC overshoot rated load, and the peak current pulse widens within 100ms.
峰值电流或功率的测试是在其它额定负载时测试,且脉宽小于100毫秒。
It takes about 30 minutes to load the bike on the trailer and pack the gear followed by an hour 's drive.
将自行车装载运输并收拾装备大约需要30分钟,然后是一小时的车程。
Results: Compared to S rats, elastic ultimate load (EUL), the ultimate load(UL) and bending rigidity coefficient (BRC) of G1 rats ( P <0.05) improved significantly;
结果:与S组大鼠比较:G1组弹性载荷、最大载荷和刚性系数显著恢复(P <0 .0 5 ) ;
It presents wind load "s extremum and shape coefficient in 100year design reference period. The conclusion supplies references to similar structures in design of resisting wind at westward region."
给出了100年重现期屋面极值风荷载等压线图和体型系数,所得结论对于西部地区此类结构的抗风设计有参考作用。
It presents wind load "s extremum and shape coefficient in 100year design reference period. The conclusion supplies references to similar structures in design of resisting wind at westward region."
给出了100年重现期屋面极值风荷载等压线图和体型系数,所得结论对于西部地区此类结构的抗风设计有参考作用。
应用推荐