Risk assessment is an essential step of loan or insurance underwriting processes, and the risk grade calculation operation usually lends itself very naturally to a business rule based implementation.
风险评估是贷款或保险承保流程必不可少的一步,且风险等级计算操作通常有助于基于业务规则的实现。
Zoning of forest fire risk grade is a scientific basis for macro-decision and regional guidance of forest fire prevention.
森林火险等级区划是森林防火宏观决策和分类指导的科学依据。
In view of the case of karst in Anshan city, the risk area of karst collapse is forecasted and its risk grade is assessed.
针对鞍山市区的岩溶情况,进行岩溶塌陷风险区预测及风险区等级评估。
This risk grade is only for reference. Investor should not require Qilu Bank to take responsibilities based on the risk grade.
该评级仅供参考,投资者不得基于该风险评级要求齐鲁银行承担责任。
Evaluations are conducted on the possibility of major hazard source accidents, severity, inherent risk and risk grade and the practical calculations are also conducted.
对重大危险源事故易发性、事故严重度、固有危险性及危险等级进行了评价,并进行了实例计算。
Quantitative safety assessment on probability of fire and explosion in LPG storage and filling station is done by method of code evaluation combined with risk grade evaluation.
运用规范评价和危险程度评价相结合的方法,对液化石油气储配站发生火灾爆炸的危险性进行了定量安全评价。
Believing degree criterion of fuzzy characteristic quantity of risk grade of system was discussed, and unreason of believing degree in property recognized theory was pointed out.
探讨了系统危险等级模糊特征量的置信度准则,指出了属性识别理论中置信度准则的不合理性。
The adjacent bridge pile risk grade is classified according to the bridge piles spatial location. The corresponding reinforcement measures are adopted according to bridge risk grade.
根据邻近桥桩与地铁空间位置关系,将邻近桥桩划分不同的风险等级,采取相应的控制措施。
The average pollution index was 1.28 and the risk grade of degradation was 3. It showed that the sediment in the cage culture area was contaminated and near the middle degradation risk.
网箱海域底质有机物单因子质量指数为1.28,老化风险为3级,说明沉积环境受到有机物的明显污染,面临中等程度的老化风险。
The quantitative RBI technique was used to analyze the risk of DEA Regenerator, and invalidation likelihood, consequence and risk grade of the each component of Regenerator were obtained.
运用定量rbi技术对DEA再生塔进行了详细的风险分析,得到了塔体各部件具体的失效可能性、失效后果和风险等级。
The quantitative RBI technique was used to analyze the risk of DEA Regenerator, and invalidation likelihood, consequence and risk grade of the each component of Regenerator were obtained.
运用定量rbi技术对DEA再生塔进行了详细的风险分析,得到了塔体各部件具体的失效可能性、失效后果和风险等级。
应用推荐