The function of financial derivatives transaction is also changing from risk protection to risk management and risk allocation.
金融衍生交易的功能也正在从风险防范向风险管理与风险配置转变。
This paper first proposes a definition for equipment risk, and then formulates a cost-based equipment risk allocation optimization model.
文章对设备风险进行了定义,并构建了基于维护成本的设备风险分配优化模型。
Actually, different risk allocation principles are provided in different contract conditions of FIDIC, providing a great flexibility for the Employer to choose the procurement method of a project.
实际上,FIDIC在其不同的合同条件中采用了不同的风险分担原则,这给业主方在选择项目采购方式上以极大的灵活性。
Abstract: Based on the engineering contract risk analysis, elaborates the three principles of project contract risk allocation.
[摘要]在对工程合同风险进行分析的基础上,阐释了工程合同风险分配的三大原则。
Compared with the conditions of construction contract of EPC mode and the traditional mode, risk allocation principles are very different.
EPC合同模式与传统的施工合同条件模式相比,风险分配原则有很大的不同。
In the stage of the risk allocation, it attains the material criterion to allocate the risk between the subjects on the basis of risk predilection coefficient.
在风险分配中,以风险偏好系数为基础,确定了主体之间风险分配的具体依据。
In this paper, the author discusses risk control system of contract energy management from four areas, risk aversion, risk prevention, risk allocation and risk transfer.
本文从合同能源管理的风险回避、风险防范、风险分配、风险转移等四个方面论述合同能源管理的风险控制体系。
Risk budgeting as the new risk management method has changed the role of risk allocation from the risk limited preventing role to an aggressive role of risk optimization.
风险预算作为一种新的风险管理方法,已经将资产配置从一个限制风险的防御性角色转变为一个最优化风险的主动进攻型角色。
By contract risk evaluation, risk disposal ability evaluation and risk strategy cost calculation, proposes the contract risk allocation model based on engineering dynastic operation.
并以合同风险评价、风险处置能力评估、风险策略成本测算为依托,提出了基于工程动态运行的合同风险分配模型。
Risk Allocation How should risks be handled and allocated during DB and Operation periods?
风险的分配在设计—建筑和运营期,风险如何处理和分配?
Risk Allocation How should risks be handled and allocated during DB and Operation periods?
风险的分配在设计—建筑和运营期,风险如何处理和分配?
应用推荐