Its revised design flood is 40 % higher than its existing spillway capacity.
该水库修改后的设计洪水将比现有溢洪道泄洪能力提高40%。
The results and conclusions of test specifications using the revised design were introduced, and some suggestion about the necessary mating work after publication was also described.
介绍了按修订规范进行试设计的效果;还对规范公布后的配套工作提出了建议。
The results and conclusions of test specifications using the revised design were introduced, and some suggestion about the necessary mating work after publication was also described.
介绍了按修订规范进行试设计的效果;还对规范公布后的配套工作提出了建议。
应用推荐