This article has outlined an approach for executing the data quality plan to complete the Data Quality Analysis such that it can impact the effectiveness of an SOA service.
本文介绍了一种数据质量计划的执行方法,可以完成数据质量分析,从而提高SOA 服务的有效性。
Runtime analysis has a place during the interactive compile-edit-debug development cycle and also in the automated builds and tests that are a key part of any project's quality plan.
交互的开发周期和工程质量方案中重要的自动化构建、测试过程中都会包含运行时分析。
Work out quality plan for new components.
制定新零件的质量计划。
Manage quality plan and quality improvement, especially product quality.
负责质量策划和改进,尤其是产品质量的策划和改进。
A quality plan often makes reference to parts of the quality manual or to procedure documents.
通常,质量计划引用质量手册的部分内容或程序文件。
Joint quality plan to include economic, technology, three aspects of management.
联合质量计划中一般要包括经济、技术、管理等三个方面。
Job description: Perform quality inspection and process control regarding work instruction and quality plan.
岗位职责:按照作业指导书及质量计划,进行产品的检验及过程控制。
Customer requirements and references to its technical specifications shall be included in the planning of product realization as a component of the quality plan.
作为质量计划的一部分,顾客要求和引用的顾客技术规范必须包括在产品实现的策划中。
Develop and set up product qualification test plans and quality plan, learn structure, parameter and function of new design, research more applications of the tools.
开发和制定新产品测试计划及质量控制计划,了解新品设计结构、参数及功能,研究产品的使用特性。
B. the supplier's actual manufacturing process conforms to the manufacturing and quality plan documented by the supplier in PPAP, GP-12 and other required documentation.
供应商的当前生产流程是否符合供应商在PPAP,GP-12或其它要求的文件中所记录的制造和质量计划。
The quality plan summarizes the specifications that shall be followed in the quality control of the design, purchase, fabrication, installation, inspection and factory documents of the filters.
本计划概述了过滤器的设计、采购、制造、安装、检验、出厂文件的质量控制所遵循的规范。
For any special requirements which are not covered by the existing Quality System documents, the Engineering Manager is responsible for the preparation of a Quality Plan.
如顾客有特别要求,而现有的质量体系文件无相关内容时,技术经理须负责制订质量计划。
These problems could make the software project lose control on quality, plan and cost and make bad result at last.
这些问题将会使软件项目在质量、进度、成本等方面失去控制,最终导致失败。
These problems could make the software project lose control on quality, plan and cost and make bad result at last.
这些问题将会使软件项目在质量、进度、成本等方面失去控制,最终导致失败。
应用推荐