Figure 1 details the conceptual architecture of the project system.
图1详述了工程系统概念性的体系结构。
Installing Linux is usually as easy as downloading a CD image, burning it to a disk, and booting from it on your project system.
安装Linux非常简单,只需要下载一个CD映像,将其烧录到磁盘中,然后在项目系统上启动它。
It probably goes without saying, but all of these projects assume that the project system has been thoroughly cleansed and its data backed up elsewhere.
这通常是毋庸置疑的,但所有这些项目都假定项目系统已经经过彻底清理并且其数据已备份于别处。
Project training mode: using project system to help you grow and achieve self-worth.
项目制培养方式:以项目制帮助员工成长,实现自我价值。
The project system employs a property inheritance model, which extends your ability to manage project configurations.
项目系统使用属性继承模型,该模型能提高您管理项目配置的能力。
The file is never copied or overwritten by the project system.
项目系统从不复制或覆盖文件。
There is nothing in the project system to enforce the use of this namespace by the custom tool.
专案系统中无法强制自订工具使用此命名空间。
Describes property Settings that indicate what actions the project system should perform on the files.
描述指示项目系统应对文件执行什么操作的属性设置。
The project system differentiates properties into two types: simple properties and aggregate properties.
项目系统将属性区分为两种类型:简单属性和聚合属性。
With simplified build configurations, the project system determines whether to build a debug or release version.
通过简化的生成配置,项目系统确定是生成调试版本还是发布版本。
This message box is displayed when the project system could not create a com interop wrapper for a particular component.
当项目系统未能为特定组件创建COM互操作包装时,将显示此消息框。
Starting from the theoretical ecology, the characteristics of the engineering project system is similar to the ecosystems.
从生态学的理论出发,工程项目系统具有和生态系统相似的特征。
The solution opens with the new project system visible in solution Explorer, plus the files from the old version of the solution.
该解决方案打开,可以在解决方案资源管理器中看到新的项目系统以及该解决方案旧版本中的文件。
PE files are compiled from custom tools that indicate to the project system that their output is to be compiled into a temporary PE.
PE文件是从自定义工具进行编译的,这些自定义工具向项目系统指出其输出将被编译到临时PE中。
Describes the consequences and options if the project system cannot create a com interoperability wrapper for a particular component.
描述在项目系统无法为特定组件创建COM互操作包装时的结果和选项。
It is a nonlinear dissipative structure, the same as life system in respect of evolvement and balance. The Logistic model meets the condition of construction project system development.
工程项目生态系统的演化、平衡和生命系统一样,是个非线性的耗散结构,其演化和平衡满足逻辑斯谛模型。
The system architecture, the project system configuration and the trunk quantity calculation of wireless local telephone campus network are described in combination with a project example.
通过一个工程实例,介绍了无线市话校园网的系统结构、系统配置及中继数量的计算。
Under the new management system-scientific research project system-full-process management pattern is better and suitable for scientific institutes' management of scientific research projects.
在科研计划实施课题制管理的新形势下,全过程管理是比较适合科研院所课题管理的一种模式。
The project system reliability analysis method is adopted. The limit state equation is established. The calculation method of fully mechanized working face support system reliability is pointed out.
并采用工程系统可靠性分析方法,建立了综采工作面支护系统极限状态方程,提出了综采工作面支护系统可靠性的计算方法。
On this foundation, the thesis discussed the technique route, total technique project, system function, database construction, software system etc, of the system's development.
在此基础上对系统建设的技术路线、总体技术方案、系统功能、数据库结构、软件体系等进行了深入的讨论。
On this foundation, the thesis discussed the technique route, total technique project, system function, database construction, software system etc, of the system's development.
在此基础上对系统建设的技术路线、总体技术方案、系统功能、数据库结构、软件体系等进行了深入的讨论。
应用推荐