• In order to flush sediment through, project engineers have designeda series of openings known as sluice gates at the base of the dam.

    为了让泥沙和水流一起通过大坝,工程的设计师们在大坝底部设计了一系列的水闸门。

    youdao

  • Through this method, the potential additional cost can easily be calculated and compared, which is helpful for project engineers to make a rational decision.

    该方法可以方便地计算与比较潜在的附加风险,这有利于项目工程师作出更加理性的决策。

    youdao

  • In static loading tests of this project, engineers adopted the self-balance method and solved construction problems successfully.

    该工程的静载试验采用了自平衡法,成功解决了工程难题。

    youdao

  • In static loading tests of this project, engineers adopted the self-balance method and solved construction problems successfully.

    该工程的静载试验采用了自平衡法,成功解决了工程难题。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定