• The course from design to project completion is just like eclosion. The hardships of eclosion accomplish the beauty of butterfly.

    一个建设项目从设计到竣工的过程,如同一次破茧化蝶的过程,破茧的艰辛成就了化蝶的美丽。

    youdao

  • Formal risk management greatly improves the likelihood of successful project completion, and it reduces the potential negative consequences of those risks that cannot be avoided.

    正式的风险管理极大的提高了项目成功完成的可能性,并且降低了那些不可避免的风险的潜在负面结果。

    youdao

  • Overall project completion is scheduled for 2010.

    整体工程预计在2010年完成。

    youdao

  • The SPI, Which is used to forecast project completion date , is calculated by using which formula?

    进度执行情况指数被用于预报项目的完工日期,是以哪个公式计算的?

    youdao

  • Monitoring data show that all pollutant indexes have reached design standard after project completion.

    竣工监测数据表明,各项污染物指标均达到设计要求。

    youdao

  • Following technical materials should, by contractor on the date of project completion acceptance, be provided to employer.

    施工单位应当在工程竣工验收合格之日向建设单位提供下列技术资料。

    youdao

  • Keep effective contact with Engineering Group document controllers, receive and manage as-built documentation upon project completion.

    和技术服务、运营及项目有关的文控人员保持有效联系,对完工的项目进行竣工文件接收和管理。

    youdao

  • Uncertainty factors of a project construct process which includes randomicity and fuzziness affect the evaluation of project completion time greatly.

    项目建设过程中的不确定性因素对预测项目完工时间有较大影响,项目中的不确定性主要是随机性和模糊性。

    youdao

  • The application of the method can help improve the accuracy of project scheduling management, ensure project completion within the acceptable deviation.

    该方法的运用能够提高项目进度管理精度,保证项目在可接受的进度偏差范围内完成。

    youdao

  • The errors of the mean and standard deviation of the time of activity and project completion caused by assumptions are given by means of deviation tests.

    利用检验的办法确定了PERT假设前提对工序时间的均值、标准离差及总工期所产生的误差。

    youdao

  • Abstract: Construction engineering Technic material is the completion of the project completion and acceptance of the important basis of quality grade evaluation.

    摘要:建筑工程施工技术资料是工程完成后竣工验收评定质量等级时的重要依据。

    youdao

  • The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.

    进行了完工概率分析,较好地描述了施工进度计划的不确定性,为施工工期论证分析提供了依据。

    youdao

  • The paper presents a scheme for optimizing raising funds for construction units by computing and analysing interest, tax and fund cost, which lays a good foundation for project completion.

    根据系统的观点,通过项目贷款利息、税金以及资金成本的计算、分析,优化建设单位的资金筹措方案。进而为项目建设的顺利进行奠定坚实的基础。

    youdao

  • The paper presents a scheme for optimizing raising funds for construction units by computing and analysing interest, tax and fund cost, which lays a good foundation for project completion.

    根据系统的观点,通过项目贷款利息、税金以及资金成本的计算、分析,优化建设单位的资金筹措方案。进而为项目建设的顺利进行奠定坚实的基础。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定