• As a result, it shows good performance in electric power test and electronic teaching experiment.

    在电力测试设备、电工电子实验教学设备的设计应用中效果很好。

    youdao

  • Main Course: Computer control and system, Signals and Systems, Electric power test technology and system and so on.

    主讲计算机控制与系统、信号与系统、电力测试技术与系统等课程。

    youdao

  • A low power test approach for test or built-in self-test based on arithmetic additive generator is proposed in this paper.

    本文提出了一种基于算术加法生成器的测试或内建自测试的低功耗测试方法。

    youdao

  • The prototype must be made full power test according to"Guideline for the Certification of Wind Turbines"by Germanisher Lioyd.

    根据德国劳埃德船级社《风电机组认证指南》的要求,必须对设计后的样机做全功率试验,以验证其是否符合设计指标。

    youdao

  • The background noise level of this instrument under the condition of conducted disturbance and disturbance power test is provided.

    讨论了监测待测物使用工况的必要性,给出了电流参量测试仪的传导骚扰和骚扰功率的背景骚扰电平。

    youdao

  • Cast iron platform USES: used for machinery, engine power test, commissioning, and has good stability and toughness flat surface with T-slots, can be used to fixed laboratory equipment.

    铸铁平台用途:用于机械、发动机的动力实验,设备调试,具有较好的平面稳定性和韧性,表面带有T型槽,可以用来固定实验设备。

    youdao

  • The Power test executes a single stream of database queries in sequential order.

    能力测试将以连续的次序执行一个数据库查询流。

    youdao

  • The performance test of TPC-H consists of two tests: the Power test and the Throughput test.

    TPC-H性能测试包括两部分:能力(Power)测试和吞吐量(Throughput)测试。

    youdao

  • As the technological innovation center of East Power Company of State Power Corporation, the East China Electric Power Test & Research Institute should undertake the power grid technology development.

    作为国家电力公司华东公司的技术创新中心,华东电力试验研究院应承担电网的技术开发工作。

    youdao

  • Power, test time, record period, voltage lower limit, voltage upper limit, lead internal resistance, operation model, data and time parameter can be set with keyboard.

    通过键盘可设置:功率、测试时长、记录周期、电压下限、电压上限、导线内阻、操作模式、日期、时间等参数。

    youdao

  • AC electrical dynamometer is a key equipment of engine power-test system, whose load is mainly regulated by the excitation control system of electrical dynamometer.

    交流电力测功机是发动机测功系统的重要设备,励磁控制系统是测功系统负载调节的主要控制装置。

    youdao

  • People call the broken rock Sword-power-test Rock.

    后人便把这块断裂成三块的巨石叫“试剑石”。

    youdao

  • People call the broken rock Sword-power-test Rock.

    后人便把这块断裂成三块的巨石叫“试剑石”。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定