• The largest one of tidal power stations in China, Jiangxia Experimental Tidal Power Station with the installed capacity of 3200kW was built up in winter, 1985.

    我国目前最大江厦潮汐试验电站1985年建成,运行良好,取得了显著的经济效益社会效益。

    youdao

  • This paper describes the local control unit design of bulb turbine set at Mowu power station in Fujian province, which can be used as reference for the similar type power stations in China.

    目前,国产灯泡贯流机组现地控制单元采用计算机极少,文中结合福建省顺昌谟武电站灯泡贯流机组现地控制单元的设计有关问题进行探讨,可供国内类型电站设计参考。

    youdao

  • FOR power stations on the coast of China, it is often cheaper to import coal by sea from Indonesia than from mines in the interior.

    对于中国沿海发电站来说,印度尼西亚海路进口煤炭往往从内地煤矿运购更划算

    youdao

  • Some power stations in southern China were operating with only a few days' supplies of fuel in reserve, according to government officials.

    官方消息,一些华南地区发电厂仅剩下维持少数几天运转燃料储备

    youdao

  • The power stations frantically being built in China to feed the country's new electricity grid will be relatively efficient and thus less polluting than older coal plants around the world.

    为了满足中国电网疯狂建造中的电力与其他国家老式煤炭发电站相比效率较高,污染较小

    youdao

  • The interaction of harmonic currents caused by switching ac filters of inverter stations in the multi-infeed DC system of China Southern Power Grid in the year of 2008 is mainly researched.

    方法主要研究南方电网2008多馈直流系统各个逆变由于滤波器投切产生谐波电流交互影响

    youdao

  • Motor-driven and steam-driven modes are two main driving modes of feed pumps in China power stations.

    国内电站锅炉给水泵驱动方式主要电动两种

    youdao

  • In the southwest of China, many large-scale underground power stations were built in the high mountain zone with high in-situ stress.

    中国西南许多大型地下电站高山峡谷地区,该地区普遍较高的初始地应力

    youdao

  • The future studies on how to develop the ceramic fans in china power stations finally pointed out.

    提出我国近年来电站陶瓷风机研究课题。

    youdao

  • Arup has worked on over 500 projects in China, including sports venues, masterplans, hotels, offices, airports, libraries, power stations, Bridges, highways and railways.

    雅纳中国参与了500多个项目包括体育场、总体规划、酒店办公楼机场图书馆电站桥梁高速公路铁路

    youdao

  • Arup has worked on over 500 projects in China, including sports venues, masterplans, hotels, offices, airports, libraries, power stations, Bridges, highways and railways.

    雅纳中国参与了500多个项目包括体育场、总体规划、酒店办公楼机场图书馆电站桥梁高速公路铁路