• Combined with practical work the construction technology of post-grouting bored pile is introduced and discussed from test pile, construction procedure, pile foundation test and other aspects.

    介绍了后压钻孔灌注桩施工工艺结合工程实例试桩、成工艺桩基检测等方面进行了论述,指出后压浆钻孔灌注桩工艺具有承载力高、工程造价低的特。

    youdao

  • The most interested problems of the design of post base-grouted bored pile are the estimate of the quantity of grouting and the bearing capacity.

    注浆灌注桩单桩合理注浆与承载力计算成为工程界关注的主要问题之一,尚无设计规程可循。

    youdao

  • Based on actual projects, it carries out research on the choice of post-grouting method, grouting quantity and bearing capacity of bored pile, and the application of post-grouting in super-long pile.

    结合实际工程,对嵌入卵石层钻孔灌注桩后压设计、施工中后压浆方法选择注浆的确定、后压浆桩的承载力计算、后压浆在超长中的应用等进行研究

    youdao

  • The tests show that the longer the age of bored piles, the higher the opening pressure of pile end post grouting. However, the age of bored piles has little influence on the final grouting pressure.

    注浆试验表明:随着成龄期增加压力也相应增大,龄期注压力影响不大

    youdao

  • Sometimes, in order to overcome these shortcomings to use bored piles and post-grouting pile, but bored piles are difficult to drilling in sand stratum, drill pipe sticking and dropping often appears;

    有事为了克服以上缺点改用钻孔灌注桩后压灌注桩,灌注桩砂土地层不易钻进,常出现卡钻;

    youdao

  • The post-pressure grouting bored pile is used in the foundation de…

    基础采用底部后钻孔灌注桩体系。

    youdao

  • The post-pressure grouting bored pile is used in the foundation de…

    基础采用底部后钻孔灌注桩体系。