• The definition of PMC equation model (that is equation description of PMC model) was first set up.

    首次建立起PM C方程模型的定义(即PMC模型的方程描述)。

    youdao

  • The PMC model is a classical diagnostic model, which has two famous diagnosis strategies: precise strategy and pessimistic strategy.

    PM C模型是并行计算系统中的一种经典的诊断模型,在该模型下有两个著名的诊断策略:精确策略和悲观策略。

    youdao

  • To counter the weakness in traditional diagnosis algorithm, we have set up a framework of equation diagnosis algorithm for PMC model in 2003.

    针对传统诊断算法的弱点,作者于2003年建立起了PMC模型方程诊断算法的框架。

    youdao

  • For the loosely coupling distributed structure of ship dynamic positioning system, a new distributed system level fault diagnosis algorithm based on adaptive PMC model is proposed.

    针对松散耦合的船舶动力定位系统分布式体系结构,提出了一种基于改进的二值pmc模型的分布式系统级故障诊断算法。

    youdao

  • The results show that the adaptive PMC model is applicable, the distributed system level diagnosis algorithm is proper, and the applications of diagnosis and verification are reliable and practicable.

    结果表明:改进的PMC模型适用,所提出的分布式系统故障诊断算法正确,故障诊断与验证应用程序可靠、实用。

    youdao

  • There are three approaches to evaluating performance using PMCs from a low level to a high level: the raw PMC event, metrics, and the CPI breakdown model.

    使用PMC评估性能有三种方法,从低级到高级依次是:原始pmc事件、指标和CPI细分模型。

    youdao

  • The CPI breakdown model is completely determined by the PMC events designed for the specific processor.

    CPI细分模型完全由为特定处理器设计的PMC事件决定。

    youdao

  • The work is also an important supplement to the characteristic theory of a PMC structure and the theoretical model of a PBG cover.

    这也为PMC结构的特性理论、PBG覆层的理论模型作了重要的补充。

    youdao

  • Project management Contracting (PMC) is a new construction project management model, which emerged in international construction industry recently.

    项目管理承包模式是近年来国际工程界出现的一种项目管理和承包模式。

    youdao

  • While, PMC doesn't have fixed operation model, what's more, the project success mainly depends on project Management Contractor's capability and professional ethics.

    然而项目管理承包模式尚没有形成固定的运作方式,项目的成败很大程度上依赖于项目管理承包商控制项目的能力和职业道德。

    youdao

  • Supervise and update material unit price, supplier information and minimum stock, lead time of each model for PMC and other documents in purchasing department.

    管理并更新材料单价、供应商信息、最小库存、每种材料的采购时间和采购部的其它文件;

    youdao

  • Supervise and update material unit price, supplier information and minimum stock, lead time of each model for PMC and other documents in purchasing department.

    管理并更新材料单价、供应商信息、最小库存、每种材料的采购时间和采购部的其它文件;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定